Similar Projects
Clawson Park-Upgrade - City of Royal Oak
Infrastructure
Conception
$500,000 est. value
Royal Oak, MI 48073

Community Recreation Center - City of Holland
New Construction - 70,000 SF
Conception
$9,500,000 est. value
Holland, MI

Legacy Park at Green Oak
New Construction
Design
Brighton, MI 48116

Playground installation
New Construction
Bidding
$50,000 est. value
Wyoming, MI

Patrick Mankowski Elk Park Improvements
Renovation
Bidding
$500,000 est. value
Gaylord, MI 49735

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

Kennedy Park Expansion
Addition
Post-Bid
Detroit, MI

Mermaid Park Renovation
Results
Marysville, MI 48040

Martin Park Splash Pad Design / Build
Results
Ferndale, MI 48220

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

John M. Patriarche Park - Reconstruct Tennis Courts for Pickleball - City of East Lansing
Renovation
Conception
$380,000 est. value
East Lansing, MI 48823

Play Ground Surface, Equipment and Structures
Post-Bid
Sturgis, MI 49091

Woods Creek Playground Development at Lower Huron Metropark
Results
Brighton, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
New Construction
Conception
$325,000 est. value
East Lansing, MI 48823

Montibeller Park Improvements- Phase 1
Renovation
Post-Bid
Ann Arbor, MI

Last Updated 07/21/2022 07:34 AM
Project Title

Ludington State Park - Big Sable Point Lighthouse Protection

Physical Address View project details and contacts
City, State (County) Ludington, MI 49431   (Mason County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $10,650,830 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Evenly grading the existing slope between the existing sheet pile wall and lighthouse foundation and install rip rap over geotextile fabric. An armored stone trench will be constructed behind the existing sheet pile wall to convey water from breaking waves away from the lighthouse and back to Lake Michigan. Approximately 300 Tons of 3 to 6 ton armor stone will be placed waterward of the existing sheet pile wall to protect the existing sheeting and dissipate wave energy, and 270 cyd of MDOT heavy rip rap over geotextile fabric landward of the existing sheet pile wall. Approximately 400 linear feet of pile cap on the existing sheet pile wall will be replaced at the locations shown on the plans.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents