Similar Projects
HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

HVAC and Mechanical Products
Term Contract
Post-Bid

Remington Building (49RMB) Cooling Tower Replacement
Results
Less than $100,000 est. value
Lakewood, CO 80215

Heat Exchanger
Post-Bid
Golden, CO

Replace HVAC and Lighting Systems
Results
Less than $554,000 est. value
Lakewood, CO 80215

Community Recreation Center HVAC Upgrade
Post-Bid
Arvada, CO 80003

Annual Chiller Maintenance
Term Contract
Results
Lakewood, CO 80232

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Mechanical and Electrical Upgrades at 3 Troop Offices
Results
Less than $62,000 est. value
Lakewood, CO

Replace Computer Room Downflow Air Condition (Crac) System, Golden CO
Term Contract
Post-Bid
Golden, CO 80401

Heat Exchanger Tube Bundles
Results

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Last Updated 02/25/2022 03:07 AM
Project Title

Replace Temperature Controls (Archive Humidity Control), Lakes Library

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $230,753
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services is included in the construction drawings and project manual, but in general will consist of the addition of a de/humidification unit with an associated outdoor condensing unit, associated piping, and framing modifications to accommodate for the new unit and piping. There will also be an associated filtration system. The main unit will occupy the ceiling space just outside of the archive space, utilizing existing ductwork for air distribution. Control modifications will be required to incorporate existing hydronic heating around the perimeter walls of the archives space. Primary piping tie-ins will occur in the steam tunnel below the archive space and stair landing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents