Similar Projects
George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

Plum Orchard Group D (FRC) - (Re-Bid)
Infrastructure
Bidding
$100,000 CJ est. value
New Orleans, LA 70112

Plum Orchard Group D (FRC) - (Re-Bid)
Infrastructure
Bidding
$100,000 CJ est. value
New Orleans, LA 70112

Interstate Sweeping In District 02
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value

Interstate Sweeping In District 02
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value

US 90b:La 428 Overpass (Level Appr Slab)
Infrastructure
Results
$100,000 to $250,000 est. value
LA

Us 90b:La 428 Overpass (Level Appr Slab)
Infrastructure
Results
$100,000 to $250,000 est. value
LA

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

RR105 Lower Ninth Ward NE Group C - (Re-Bid)
Infrastructure
Bidding
$530,000 CJ est. value
New Orleans, LA 70112

Downtown Loop Pavement Replacement Phase 2
Infrastructure
Post-Bid
New Orleans, LA

I-10 Ramps LA 3019 INT IMP
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Construction of a Bacteriological and Wet Chemistry Lab for the Jefferson Parish Eastbank Water Department
New Construction, Infrastructure
Design
$440,000 CJ est. value
Kenner, LA 70065

Leo Kerner Bike Path
Infrastructure
Bidding
$3,100,000 CJ est. value
Westwego, LA 70094

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Last Updated 08/30/2022 03:03 PM
Project Title

DPW715 - Right of Ways (ROW) Improvements - District C East Bank, French Quarter, Central Business District

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70112   (Orleans County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids received after the Bid Deadline will be date stamped and returned to the bidder unopened. The City will open the bids in public at the Purchasing Bureau. License - The bidder shall include in the bid the applied current license(s) number(s) for the following project classification(s) Highways,Street,and Bridges Municipal and Public Works Construction A bid bond or security in an amount not less than five percent of bid amount, conditioned on the bidders failure to execute a contract with the City to supply the specified goods or services. Bidders shall provide bid security in the form of a bid bond, cashiers check or certified check (as per R.S. 38:2218) in the amount of the bid price (Base Bid and any Alternates). If submitting a bid electronically, A bid bond submission is required by uploading the required paper bid bond online. The City requires a Bid Bond entered Online. If submitting a bid via sealed envelope the City will accept a cashiers check, certified check or satisfactory bid bond payable to the City. The City will retain bid securities of the three (3) lowest responsible bidders until the Contract is executed or until final bid disposition. The City will return other bid securities after the bid canvass. At contract execution, the City will return bid securities not forfeited for failure to execute a contract with the City. All bids remain valid for 90 calendar days after the Bid Deadline. In the interest of ensuring that efforts of the Contractor do not conflict with the interests of the City, and in recognition of the Contractors responsibility to the City, the Contractor agrees to decline any offer of employment if its independent work on behalf of the City is likely to be adversely affected by the acceptance of such employment. The initial determination of such a possibility rests with the Contractor. It is incumbent upon the Contractor to notify the City and provide full disclosure of the possible effects of such employment on the Contractors independent work in behalf of the City. Final decision on any disputed offers of other employment for the Contractor shall rest with the City. All non-public works contracts have a default goal of 35% DBE participation

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents