Similar Projects
Sagebriar Planned Unit Development
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Greenwood, IN 46143

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

Wellness Center - Center Grove Community School Corporation - General Trades / Site work (BP#01)
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Greenwood, IN 46143

Wellness Center - Center Grove Community School Corporation - Structural Steel (BP#02)
New Construction, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Greenwood, IN 46143

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Center Grove Middle School North - Early Bid Package No.2 - Site and Foundations
Infrastructure
Post-Bid
$400,000 CJ est. value
Greenwood, IN 46142

Saddle Club Road Water Main Extension
Infrastructure
Results
Bargersville, IN 46106

Westside Regional Interceptor - Phase 1
Infrastructure
Results
$2,292,995 CJ est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

Graham Road Extension
Infrastructure
Bidding
$300,000 CJ est. value
Franklin, IN 46131

South Grove Landing Sewer Main Extension
Infrastructure
Post-Bid
$500,000 est. value
Bargersville, IN 46131

Pavement Patching - 1-65
Infrastructure
Results
$2,928,000 CJ est. value
Franklin, IN 46131

Founders Point Apartments
New Construction, Infrastructure - 71,400 SF
Pending Verification
$20,000,000 CJ est. value
Franklin, IN 46131

Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Post-Bid
$5,500,000 CJ est. value
Trafalgar, IN 46181

Last Updated 05/15/2023 02:09 PM
Project Title

Misc. Water Main Extension Project

Physical Address View project details and contacts
City, State (County) Bargersville, IN 46106   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $210,470 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposal must be made on the forms provided in the Contract Documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, or an acceptable bidder's bond, in an amount not less than five percent (5%) of the total amount of the bid, payable to the Town of Bargersville, Indiana. The bidder to whom a contract for work is awarded will be required to furnish a Performance and Payment Bond executed on the specified forms and acceptable to the Town, in the amount of one hundred percent (100%) of the Contract. The bidder must supply all the information required by the bid proposal form. Partial payment will be made monthly based on an approved payment request. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, Non- segregated Facilities, and Affirmative Action requirements. The Town of Bargersville, Indiana, reserves the right to reject any and all proposals or parts there-of and to waive all responsibility for irregularities in bids. Bids may be held by the Town of Bargersville, Indiana for a period not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to the awarding of the Contract. The Project includes the installation of approximately 2,200 feet of 6"-12" water main in three separate areas within the Bargersville Water Service Area. The work includes excavation, pipe installation, disinfection, testing, connection to existing mains, maintenance of traffic, utility coordination, demolition, clearing and grubbing, erosion control, and all restoration to return the Project area to at or better than existing conditions. PROJECT START DATE: May 1, 2023 SUBSTAINTIAL COMPLETION DATES: C.R. 300 Pennington Rd. S.R. 135 June 1, 2023 July 1, 2023 August 1, 2023 FINAL COMPLETION DATE: September 1, 2023

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents