Similar Projects
Outfall Backflow Prevention
Infrastructure
Bidding
Milwaukee, WI

Public Construction Phase 5 Site Utilities (Public and Private) at Westlawn Gardens Phase 2
Infrastructure
Bidding
Milwaukee, WI

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

2021 Water Main Relay Project
Post-Bid
Brown Deer, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Weatherly Water Main Extension
Addition
Results
Oak Creek, WI 53154

Private Property Infiltration and Inflow Reduction Municipal Contractors
Post-Bid
Milwaukee, WI

75 Lead Service Line Replacements - Winter
Results
Milwaukee, WI

100 Lead Service Line Replacements
Post-Bid
Milwaukee, WI

Water Main Relays
Results
Less than $2,216,000 est. value
Milwaukee, WI

City-Wide Water Main Trench Repair
Post-Bid
Saint Francis, WI

Water Main Relays with Lead Service Line Replacement
Results
Milwaukee, WI 53200

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI

Carrington Avenue and Kirkwood Avenue Water Main Replacement and Asphalt Pavement Rehabilitation
Results
$300,000 est. value
South Milwaukee, WI

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI 53274

Last Updated 03/21/2022 04:28 PM
Project Title

Grit Dewatering Screw Conveyor Tail Bearing Replacement

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall replace tail bearing assemblies on three grit dewatering screw conveyors at the Jones Island Water Reclamation Facility in Milwaukee, Wisconsin. The tail bearing assemblies shall include a mechanical seal assembly and new stub tail shaft. • The Contractor shall procure the tail assemblies and flushing water control devices from a fabricator designated by the District and install both on each of the three existing Grit Dewatering Screw Conveyors. • The Contractor shall tie into existing conduit of each existing Zero Speed Switch Panel and install galvanized rigid conduit and control wiring to each new solenoid valve on the plant (W3) flushing water supply to each corresponding seal assembly. Control wires to be terminated at both locations by Contractor. • The Contractor shall also run galvanized pipe, tying into an existing W3 water supply pipe, and connecting to the flushing and quench portals on each of the mechanical seal assemblies. The quench water discharge (drain) shall also be piped open ended to the top of each trough.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents