Similar Projects
Rock Quarry Road Generator Installation (Informal)
Bidding
Raleigh, NC 27610

Front Street Generator Installation (Informal)
Bidding
Raleigh, NC 27609

Power to Varsity Research Building
Post-Bid
Less than $1,500,000 est. value
Raleigh, NC

Central Campus Electrical Distribution Upgrade Phase 2
Post-Bid
Raleigh, NC

Generator Service Contract
Term Contract
Results
Less than $22,944 est. value
Angier, Cameron, Fuquay-Varina, Lillington, NC 27546

Worthdale Park - Ballfield Lighting
Results
Less than $100,000 est. value
Raleigh, NC 27610

Electrospray Aerosol Generator
Bidding
Raleigh, NC

Cary/Apex Water Treatment Facility Ozone Generator Replacements
Post-Bid
Apex, NC

Moore Square Parking Deck Lighting Upgrades
Results
Raleigh, NC

Holiday Express Lighting
Bidding
Raleigh, NC 27606

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Terminal 2 and Airport Operations Center PCF Room UPS Replacement
Results
Less than $369,200 est. value
Raleigh, NC

2021 Multi Site Solar PV Project
Bidding
NC

DPS - ABC Commission - Warehouse Building Power Improvements
Post-Bid
Raleigh, NC 27610

Waverly F. Akins Office Building and Wake County Courthouse Emergency Power Replacement
Results
Less than $1,259,398 est. value
Raleigh, NC 27601

Reported 02/07/2020 12:00 AM
Project Title

Central Campus Electrical Upgrade Phase 2 Distribution

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27607   (Wake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The NC State campus between Western Boulevard and Hillsborough Street has an aging underground electrical distribution system with components that have exceeded their useful life. The campus electrical infrastructure master plan will replace the aging infrastructure and install a new mainline loop configuration system to improve resiliency, capacity, and safety. The overall master plan is currently divided into 10 phases with Phase 1 almost complete. This specific project is to complete Phase 2 construction of a 15kV distribution system to include installation of new underground ductbank, cables, manholes, and switchgear for the electrical infrastructure improvements in the central precinct of campus from Wolf Village, along Western Blvd, to the intersection of Sullivan Drive and Dan Allen Drive.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents