Similar Projects
2022 Capital Projects
Infrastructure
Bidding
$700,000 est. value
Fruit Heights, UT

2022 Capital Projects
Infrastructure
Bidding
$700,000 est. value
Fruit Heights, UT

River Bottom Improvement Project Prequalification
Post-Bid

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Layton Sidewalk Improvements
Results
Less than $100,000 est. value
Layton, UT 84040

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

I-15: Pages Lane to Lagoon, Panel Replacement Preservation High Volume
Infrastructure
Bidding
$4,000,000 to $6,000,000 est. value
Farmington, UT 84025

Culinary Water Line Replacements
Post-Bid
$250,000 est. value
Bountiful, UT

Construction of the 650 North Storm Drain Replacement Project
Results
Less than $75,000 est. value
Centerville, UT

SR-67; I-215 to 500 S
Infrastructure
Bidding
$4,000,000 to $6,000,000 est. value
West Bountiful, UT 84087

East Chase Lane To Parrish Lane - Culinary Waterline and Storm Drain
Post-Bid
$450,000 est. value
Centerville, UT 84014

1200 South Waterline Project
Results
$150,000 to $200,000 est. value
Syracuse, UT

North Salt Lake (NSL) Wholesale Culinary and Raw Water Pipelines Replacement Project
Infrastructure
Bidding
$980,000 est. value
North Salt Lake, UT

Last Updated 05/23/2022 12:01 AM
Project Title

1300 North Reconstruction - Main Street to 1285 West

Physical Address View project details and contacts
City, State (County) Clinton, UT 84015   (Davis County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1300 North from Main Street (SR-126) in Sunset City to 1285 West in Clinton City, Utah. The project involves the reconstruction of the 1300 North roadway corridor from Main Street (SR-126) to 1285 West. The reconstruction consists of removing and replacing road base and asphalt material. The reconstruction includes the replacement of concrete sidewalk, curb/gutter, and curb ramps. The project also includes the installation of culinary water lines, storm drain lines, and roadway lighting.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents