Similar Projects
Vermilion East Pier Repair
Design
$1,000,000 to $2,000,000 est. value
Vermilion, OH

Reconstruction of Dock Face Phase 1 Project
Infrastructure
Bidding
$1,575,878 est. value
Toledo, OH 43605

WMC Loading Dock Expansion and Renovation
Renovation
Post-Bid
Columbus, OH

Cincinnati Riverfront Boat Dock
Infrastructure
Post-Bid
Cincinnati, OH

Port Clinton Coastal Access Plan
New Construction
Results
$5,600,000 est. value
Port Clinton, OH 43452

Muskingum Valley Park District, Wildlife Viewing Platform
Results
Less than $20,000 est. value
Zanesville, OH 43702

Complete Improvements at the Piketon Boat Ramp
Infrastructure
Post-Bid
Piketon, OH

Construction Managment and Inspection Griggs Boat Launch
Results
Less than $1,327,145 est. value
Columbus, OH

Scioto River Boat Launches
Results
Less than $635,394 est. value
OH

Griggs Boat Launch Improvements
Results
Less than $1,330,000 est. value
Columbus, OH

Point Place Levee Closure Devices Replacement and Repair
Results
Toledo, OH 43604

2020-2023 Seasonal Dock Installation and Removal
Term Contract
Results
Sandusky, OH 44870

Mentor Lagoons Park Marina Bulkhead Replacement
Results
$500,000 est. value
Kirtland Hills, Mentor, OH 44060

Mahoning River Canoe/Kayak Livery
Results
$140,000 est. value
Leavittsburg, OH 44430

Canfield Loading Dock
Results
Less than $380,400 est. value
Columbus, OH 43201

Last Updated 09/28/2021 09:32 AM
Project Title

Dock 24 and 26 Master Modernization and Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the reconstruction of 1098' of bulkhead on Dock 26W. The work also includes the rehabilitation and reconstruction of the marine fenders and bollards on Docks 24 and 26. The elevations of docks 24 and 26 will be increased and include new concrete pile caps and pavement. Drainage improvements include rerouting/consolidation of storm water collection infrastructure, outfalls and the installation of water quality and subsurface water storage devices. A Small and Disadvantaged Business Enterprise goal of 15%

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents