Similar Projects
Saint Timothy Catholic School Gym and Classroom Addition - Phase 3
New Construction, Addition - 32,349 SF
Conception
Union, KY 41091

Career Technology Center Renovation
Renovation
Design
Bardstown, KY

Bardstown HIgh School Renovation
Renovation
Design
Bardstown, KY

Woodford County High School Emergency Structural Repairs
Renovation - 183,600 SF
Bidding
$41,000,000 est. value
Versailles, KY 40383

Nicholas County High School Renovation - Bid Package 5
Renovation
Bidding
$3,700,000 est. value
Carlisle, KY 40311

Corbin Middle School Concessions / Restrooms
Post-Bid
$215,000 est. value
Corbin, KY 40701

Corbin High School Career Center - Phase 1
Post-Bid
Less than $2,500,000 est. value
Corbin, KY 40701

Central Hardin High School - Bid Group 1
Renovation, Addition
Results
Cecilia, KY 42724

Harrison County Middle School Football Field Improvements
Results
Cynthiana, KY 41031

Boone County High School Addition and Renovations
Renovation, Addition - 18,573 SF
Construction
Less than $8,379,900 est. value
KY

Assumption High School Expansion
Addition - 35,000 SF
Construction
Louisville, KY 40205

School Buildings
New Construction
Pending Verification
$22,434,420 est. value
Bowling Green, KY 42104

New Pavilion - Hopkins County School
Addition - 960 SF
Pending Verification
$10,000 est. value
Madisonville, KY

Bardstown Middle School Renovations
Renovation
Design
Bardstown, KY

Russell Independent High School Multi-Purpose Facility - Phase A
New Construction
Bidding
$1,500,000 est. value
Flatwoods, KY 41139

Last Updated 06/01/2022 11:27 PM
Project Title

Breathitt County High School Coliseum Balcony Replacement and Art Room Renovation

Physical Address View project details and contacts
City, State (County) Jackson, KY 41339   (Breathitt County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project includes removal of the existing concrete cast in place Coliseum entrance balcony, stairs, railing and aluminum canopy system and replacement with new cast in place balcony, steel stair risers and precast treads, new steel railings, new structural steel supports, paint finish and prefabricated aluminum canopy. Also included in the scope of the work is the mandatory Alt #1 for the renovation of the existing Art Room in the lower level of the Fairce Woods Coliseum, and which includes a new sump pump, slab trenching and repair, polishing of existing concrete floor, demolition of abandoned MEP/Elec components not scheduled for reuse, new plumbing, new casework and a small area of new metal stud and gypsum walls, new doors and frames and paint system throughout.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents