Similar Projects
WTP #5
New Construction
Conception
$12,228,914 est. value
Buckeye, AZ

WTF #9
New Construction
Conception
$6,190,000 est. value
Buckeye, AZ

Arsenic Filter Media Replacement for Luke AFB
Post-Bid
Luke Air Force Base, AZ

Deer Valley Water Treatment Plant Finished Water Pump Station and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk Services
Renovation
Post-Bid
$30,000,000 est. value
Phoenix, AZ

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Neely WRP Facility Rehabilitation
Results
Gilbert, AZ 85233

5 Year Service Contract, for Water Treatment Service at The Aphis/Ppq/Pbwrf Facility In Phoenix, AZ
Term Contract
Post-Bid
Phoenix, AZ 85040

Union Hills Water Treatment Plant Rehabilitation 2020 CMAR
Results
Phoenix, AZ 85024

Northwest Water Reclamation Plant (NWWRP) Process Improvements
Results
$28,600,000 est. value
Mesa, AZ 85201

Beardsley Water Reclamation Facility Expansion (Design-Build)
Results
Less than $29,100,000 est. value
Peoria, AZ 85345

NWTP Alternatives Evaluation and Construction - CM at Risk Pre-Construction Services
Results
Less than $570,560 est. value
Gilbert, AZ 85296

Cave Creek WRP Rehabilitation CMAR
Results
$120,000,000 est. value
Phoenix, AZ 85003

Northwest Water Reclamation Plant (NWWRP) Food to Energy Phase 1 Flare to Fuel
Results
$3,000,000 est. value
Mesa, AZ 85211

Farallon Water Campus
Results
$6,720,682 est. value
Buckeye, AZ

Cattail Cove State Park- Construction of Water and Wastewater Treatment Systems
New Construction
Results
Phoenix, AZ 85085

Last Updated 12/03/2021 02:22 AM
Project Title

Construction Manager at Risk Farallon Water Campus 16

Physical Address View project details and contacts
City, State (County) Buckeye, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction manager/general contractor to provide preconstruction and construction services as the Construction Manager at Risk (CMAR) for the construction of Farallon Water Campus #16. The CMAR contract shall include pre-construction and construction services for the Farallon Water Campus #16 project as described in SECTION 3 – SCOPE OF WORK. Farallon Water Campus #16 is on approximately 21 acres on South Rooks Road between W. Southern Avenue and W. Broadway Road. The phased site layout will include 6.28 million gallons per day (Phase I) up to and ultimately a 19 million gallons per day (mgd) Water Treatment Facility.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents