Similar Projects
Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Village Center 2nd Addition Utility and Roadway Construction
Infrastructure
Post-Bid
Howard, WI

T. Wrightstown, Cth Zz, Clay Street - Mallard Road
Results
WI

TIF 2 Riverside Drive
Results
Less than $500,000 est. value
Suamico, WI 54173

Allouez Street Resurfacing Project
Infrastructure
Post-Bid
$600,000 est. value
Allouez, WI

Sidewalk and Curb Repair
Results
$260,000 est. value
De Pere, WI

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Curb Repair and Street Resurfacing
Results
De Pere, WI

Evergreen Road Reconstruction
Infrastructure
Post-Bid
Howard, WI 54313

Sidewalk Grinding
Results
De Pere, WI

2022 Utility and Street Construction - Autumn Joy Drive
Infrastructure
Post-Bid
$500,000 est. value
Hobart, WI 54115

Concrete
Results
Green Bay, WI

American Boulevard and Commerce Drive Concrete Paving
Infrastructure
Post-Bid
De Pere, WI 54115

Concrete Grinding Sidewalk
Results
De Pere, WI

Curb and Gutter and Concrete Flatwork Replacement
Results
WI

Last Updated 03/14/2022 03:03 PM
Project Title

Parks 2-22 Arnie Wolff Sports Complex Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54311   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract for the base bid shall consist of excavation, crushed aggregate base course, HMA pavement, clearing and grubbing, bio-retention pond, storm sewer, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract for the parking lot expansion. The work under the alternate bid shall consist of excavation, crushed aggregate base course, HMA pavement, clearing and grubbing, bio-retention pond, storm sewer, and all incidental items necessary to complete the work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents