Similar Projects
Webster Ford Road Water Tank Rehabilitation
Post-Bid
Tallassee, AL 36078

Water System Improvements - Water Tank Renovations and Water Meter Replacements
Post-Bid
Less than $500,000 est. value
Clio, AL 36017

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Three Mile Creek Severe Weather Attenuation Tanks
Construction
Less than $17,207,000 est. value
Mobile, AL

House Road Water Tank Construction
Infrastructure
Construction
Brookwood, AL 35444

Contract LWA3-20 Elevated Water Storage Tank
Post-Bid
Loachapoka, AL 36865

World-Wide Water Storage Tank Remediation
Term Contract
Results

MBUSI Water Improvements Project Proposal B Storage Tank
Post-Bid
$900,000 to $1,500,000 est. value
Centreville, AL

Greene County Water Improvements Water Tanks CFDA 10.760
Results
Eutaw, AL 35462

Storage Tank 3,000 Gallon
Post-Bid
Daphne, AL

Rehabilitation of 150,000 Water Storage Tank Contract No. 1
Results
$250,000 est. value
Pisgah, AL 35765

Tank Repainting
Post-Bid
$350,000 est. value
Brewton, AL

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "B" - Elevated Water Storage Tank
Results
Less than $3,297,000 est. value
Tuscaloosa, AL 35403

Water System Improvements
Post-Bid
$702,399 est. value
Lowndesboro, AL

Reported 01/26/2022 10:35 AM
Project Title

Water Storage Improvements

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $453,247
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water Storage Improvements: Stanton Road Tank, which includes performing miscellaneous repairs, coating, and cleaning of the Stanton Road tank and cleaning of various tank infrastructure in the system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents