Similar Projects
Baker Road Crosswalk at Forest - City of Dexter
Infrastructure
Conception
$350,000 est. value
Dexter, MI 48130

Dexter-Chelsea Road Trail Connector - City of Dexter
Infrastructure
Conception
$1,500,000 est. value
Dexter, MI

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

The Grove at Veridian
New Construction, Infrastructure - 10,076 SF
Post-Bid
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Pipe Maintenance Replacement (Medical Center) Bidpack 01- Construction
Infrastructure
Results
Ann Arbor, MI

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

220 North Park Duplexes And Cottages
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ypsilanti, MI 48198

220 North Park Duplexes And Cottages
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ypsilanti, MI 48198

Dan Hoey Road Sidewalk - City of Dexter
Infrastructure
Conception
Dexter, MI 48130

Mill Creek Brewery Development / Dexter
New Construction, Infrastructure
Design
$1,725,000 CJ est. value
Dexter, MI 48130

Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

Last Updated 01/27/2023 06:34 AM
Project Title

S. Main Street Water Main Replacement and Resurfacing Project

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,742,751 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to select a firm to provide the construction of S. Main Street Water Main Replacement and Resurfacing Project as described in the plans and specifications. Question Acceptance Deadline 12/01/2022 05:00 PM EST Questions are submitted online No Phase 1 Work - All Phase 1 work in S Main St from William to Liberty and within the William/Main and Liberty/Main intersections shall be completed as shown on the overall phasing plan. This includes the installation of watermain, storm sewer, paving, restoration, signal work, pavement markings, signage and all other work included in the Contract for this block. During this phase, the watermain shall be completed, tested and connected to the existing watermain at William, east and west on Liberty, and at the temporary connection just north of Liberty. Note that the Engineer may request watermain shutdowns to occur during non-standard hours to ensure minimal interruption to businesses along S Main St. All Phase 1 services shall be installed and connected during this phase. Existing watermain within Phase 1 limits shall be abandoned once the proposed Phase 1 watermain is tested, accepted, and put in service. Phase 1 shall be completed in its entirety and open to traffic by May 5, 2023. Phase 2 Work - All Phase 2 work in S Main St from north of Liberty to south ofHuron and within the Washington/Main intersection shall be completed as shown on the overall phasing plan. This includes the installation of watermain, storm sewer, paving, restoration, signal work, pavement markings, signage and all items of work included in the Contract for these two blocks (except for sidewalk, curb and pavement work on the southeast and southwest quadrants of Huron/Main intersection). During this phase, the watermain shall be completed, tested and connected to the existing watermain east and west on Washington and just south of Huron (connection just south of Huron shall be completed in such a way to limit disturbance to the surface at the Huron/Main intersection). The temporary Phase 1 watermain connection shall be removed and the Phase 2 watermain shall be connected to the Phase 1 watermain. Note that the Engineer may request watermain shutdowns to occur during non-standard hours to ensure minimal interruption to businesses along S Main St. All Phase 2 services shall be installed and connected during this phase. Existing watermain within Phase 2 limits shall be abandoned once the proposed Phase 2 watermain is tested, accepted and put in service. Phase 2 shall be completed in its entirety and open to traffic by July 12, 2023. Ann Arbor Art Fair (July 17 2023 - July 22, 2023) - No work is allowed within the Art Fair limits and shuttle routes between the Monday prior to Art Fair and the Monday following it (July 17, 2023 - July 24, 2023). This project falls within the limits of the Ann Arbor Art Fair. Phase 3 Work - All Phase 3 work in S Main St at the Huron/Main intersection shall not begin until after the Ann Arbor Art Fair unless otherwise approved by the Engineer. All Phase 3 work shall be completed as shown in the overall phasing plan. This includes the installation of storm sewer, paving, restoration, pavement markings, signage and all other work included in the Contract for this intersection. Phase 3 shall be completed in its entirety and open to traffic by August 25, 2023 All Contract work must be complete and open to traffic by August 25, 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents