Similar Projects
Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Bidding
FL

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Pump Control Systems, Yaskawa, Service, and Purchase of Pump Controllers, Term Contract
Term Contract
Post-Bid
FL

Sewage, Discharge and Submersible Wastewater Pumps
Term Contract
Results
Haverhill, FL 33415

Replacement of Surficial Aquifer Well HR-8A
Results
Less than $477,330 est. value
Palm Beach Gardens, FL 33410

Well Drilling and Repair Services
Term Contract
Post-Bid
FL

Deep Injection Well Monitoring Well MW-1 Replace
Results
West Palm Beach, FL

Water Treatment Plant No. 2 Treatment and Disposal Improvements Design Package 2 - Deep Injection Well
Post-Bid
FL

General Injection Well Maintenance and Testing Services
Term Contract
Results
West Palm Beach, FL 33412

Upper Floridan Aquifer (UFA) Well Rehabilitation
Post-Bid
$1,800,000 est. value
Belle Glade, FL 33430

Construction Moss Pilot Project
Results
West Palm Beach, FL

Construction of Water Treatment Plant High Service Pumps
Post-Bid
$2,000,000 est. value
Lantana, FL 33462

System-Wide Wellfield Improvements - Phase 1
Results
Less than $12,104,730 est. value
Boca Raton, Delray Beach, FL

Water Treatment Plant Class I Injection Well System Mechanical Integrity Testing
Results
Less than $70,000 est. value
Wellington, FL 33414

Reported 04/15/2021 12:00 AM
Project Title

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted

Physical Address View project details and contacts
City, State (County) FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and deliver two (2) each Centrifugal Dewatering Self-Priming Pumps - Trailer Mounted to the SFWD Miami Field Station.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents