Similar Projects
UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

SR 7, SR 507 to S of S 38th ST - Paving
Infrastructure
Bidding
$1,500,000 to $2,000,000 est. value
WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

Bremerton Station
Renovation, Infrastructure
Pending Verification
Bremerton, WA 98310

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
WA

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

I-82, Coffin Rd Vicinity Paving
Infrastructure
Bidding
$400,000 to $500,000 est. value
WA

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

Reported 03/05/2022 12:00 AM
Project Title

2nd Street Overlay

Physical Address View project details and contacts
City, State (County) Clarkston, WA 30021   (Asotin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 2nd Street Overlay Project: 8-foot wedge mill with 0.15' overlay - ADA improvements including reconstruction of pedestrian ramps - driveways - driveway entrances and sidewalk. Additionally - the project includes soft spot repairs - curb and gutter replacement - ADA pathway repair - and utility adjustments.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents