Similar Projects
OR 241: Chandler (Coos River) Bridge
Infrastructure
Design
$4,262,000 CJ est. value
Coos Bay, OR 97420

OR 241: Chandler (Coos River) Bridge
Infrastructure
Design
$4,262,000 CJ est. value
Coos Bay, OR 97420

Coos Bay Rail Line Tie Replacement and Track Surfacing Project
Infrastructure
Bidding
$185,000 CJ est. value
Coos Bay, OR 97420

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

North Bank Working Landscapes Tidal Channel Restoration Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Coquille, OR 97423

South 7th Street and Minnesota Avenue Road Rehabilitation
Alteration
Results
$515,000 est. value
Coos Bay, OR

Reconstruct and Expand Apron - Phase 1
Infrastructure
Results
$6,070,887 CJ est. value
North Bend, OR 97459

Bandon Beach Hotel
Demolition, New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Bandon, OR 97411

Powers-Agness Hwy: Burma Slide Sec (MP4.4-8.4)
Infrastructure
Design
$13,657,312 CJ est. value
Myrtle Point, OR 97458

Water System Improvements
Infrastructure
Post-Bid
$250,000 CJ est. value
Myrtle Point, OR 97458

Safe Routes to School Improvements
Infrastructure
Results
$2,000,000 est. value
Powers, OR

US 101 at East Bay Road
Infrastructure
Design
$1,614,000 CJ est. value
Bandon, OR 97411

RFQ Design - Conceptual Design and Siting of the Proposed Coos Bay Library at Topits Park
New Construction, Infrastructure
Post-Bid
$18,600,000 CJ est. value
Coos Bay, OR 97420

8th Street Railroad Path Crossing
Infrastructure
Results
$245,992 CJ est. value
Lakeside, OR 97449

Shutters Landing Bore Project
Infrastructure
Post-Bid
$300,000 CJ est. value
North Bend, OR 97459

Last Updated 02/27/2023 03:18 PM
Project Title

Grocery Outlet Site Development and New Shell Building

Physical Address View project details and contacts
City, State (County) Bandon, OR 97411   (Coos County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,400,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new 16,456 SF Grocery Outlet Shell Building with the related-On Site and Off-Site Improvements for a +/- 3.18-acre jobsite located at Hwy 101 and 17th St. Southeast in Bandon, Oregon. Timeline for the project is estimated to be 6 Months, (180) Calendar Days, with an estimated start date in Early April 2023. The new interior Tenant Improvement for the new Grocery Outlet will be bid out separately from this project and at a later date. The intent is for the two projects to run concurrently with the tenant improvement finishing later than the shell. Building Plumbing & Electrical Services: The City of Bandon requires that the Building Electrical, Mechanical & Plumbing permits be obtained by the appropriate licensed Subcontractors for the work. Selected Electrical, Plumbing and Mechanical Subcontractors will be required to submit plans included in the drawings for permits for their related scopes of work. This will be the same requirement for the Tenant Improvement Project that bids later.

Details

1 Story Above Grade, 16,456 SF, 57.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents