Similar Projects
Last Updated | 11/30/2018 09:15 AM |
Project Title | Snow Removal |
Physical Address | View project details and contacts |
City, State (County) | Bensalem, PA 19020 (Bucks County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Snow Removal at Bristol Pike Campus and Annex School Lane Charter School Tillman Drive Campus. Snow Removal services for School Lane Charter School that will commence on December 1, 2018 and run till November 30, 2021. A. The Contractor will be responsible for clearing snow and ice, and for distributing salt/ice-melt in all parking lots, walk-ways, and related drives on all School Campus Facilities. The Contractor shall be responsible for ALL parking lots, walk-ways, sidewalks, fire lanes, entrance areas and driveway areas as shown on Exhibit 1. Below is a list of all school buildings requiring snow removal and salting. The Contractor is responsible for exact measurements of parking areas, driveways and walk-ways if necessary for submitting your bid. Elementary Campus 2350 & 2400 Bristol Pike 2426 Bristol Pike IB Campus 3340 Tillman Drive 3350 Tillman Drive B. The Contractor shall ensure that all designated areas shall be completely plowed and cleared of snow/ice. All surfaces, including parking lots, driveways, etc. must be cleared of snow and have salt applied by 6:30 am or at least two (2) hours prior to the start time for each facility (on days of possible late opening). Deicing agents shall be applied to all parking areas immediately after snow removal. De-icing agents must be environmentally friendly and approved as safe for use on concrete and asphalt surfaces. C. On non-school days the schedule for plowing and salting is to be coordinated with SLCS Director of Operations so that snow removal and salting is completed 2 hours before any scheduled events. Should School Lane Charter School cancel school the contractor shall still be responsible for clearing snow. Contractor shall work with the Director of Operations to prioritize needs to allow access to buildings. D. Snow shall be placed in areas that will prevent melt water from draining back onto cleared surfaces. E. Snow removal must be available at the Contractor's pricing 24 hours a day, 7 days a week, including holidays. F. The Contractor will have salt vehicles and services available for "on call" services, twenty-four (24) hours a day, seven (7) days a week, the Director of Operations may call for services. Response time to any facility is required in thirty (30) minutes. G. The Contractor shall be responsible for plowing snow from and applying salt/ice melt to the School District's facilities on all days, including weekends and days school is not in session. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |