Similar Projects
Orangewood Lakes Water System Improvements Project
Infrastructure
Bidding
New Port Richey, FL 34653

Reclaimed Water Transmission Main Caloosahatchee River Crossing
Infrastructure
Bidding
Cape Coral, FL 33990

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

UCF Campus Infrastructure and Utility Production Facility - Industrial Mechanical and Wet-Utility Piping Work
Term Contract
Results
Orlando, FL 32826

Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Duckpond Water Main Improvements
Post-Bid
Gainesville, FL

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

NE 35th Avenue Roadway and Water Main Improvements
Infrastructure
Bidding
North Miami Beach, FL

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

CR846 Water Main Replacement Project
Results
Less than $345,000 est. value
Immokalee, FL 34142

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

Hilochee Structure Replacement - Phase 1
Term Contract
Results
Less than $230,000 est. value
Lake Alfred, FL 33850

Last Updated 06/23/2021 03:07 PM
Project Title

6815 CR 48 Reuse Extension - Spring Creek

Physical Address View project details and contacts
City, State (County) Leesburg, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $110,000 to $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves tying into an existing water reuse line at Legacy Subdivision and extending the 8-inch C-900 PVC water reuse to the entrance of the Spring Creek Subdivision. The new reuse line extension will be run along County Road 48. The majority of this work will take place in the Lake County Right of Way along County Road 48. Contactor will provide all materials, labor, supervision, and equipment necessary for the installation in accordance with the engineer drawings included in this Solicitation Package.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents