Similar Projects
Structure Repairs at Various Locations
New Construction
Bidding

Structure Repairs at Various Locations
New Construction
Bidding

CR 114 (Master Street) Over the Powamppokonk Creek Bridge Replacement (BIN 3304080)
Term Contract
Post-Bid
Schaghticoke, NY 12154

Replacement of County Route 18 Bridge Over Prendergast Creek in the Town of North Harmony
Term Contract
Post-Bid
Mayville, NY 14757

Titus Towers Bridge, Creek, and Sidewalk
Results
Less than $223,000 est. value
Ithaca, NY 14850

Cedar Street BR (261-01) Over Ledge Creek Replacement
Results
Buffalo, NY 14202

Albright-Knox Gundlach Art Museum AK360 Expansion
New Construction - 29,000 SF
Construction
$155,000,000 est. value
Buffalo, NY 14222

Dwyer Dam Bridge Rehabilitation
Renovation
Construction
$2,380,106 est. value
Ithaca, NY 14850

Gardner Hollow Road Bridge
Renovation
Bidding
Poughquag, NY 12570

2020 Bridge Deck Sealing of 22 Bins and Washing of 218 Bins
Post-Bid
Little Valley, NY 14755

Rehabilitation of 8 Bridges on Route 8, Joints, Bearing Replacement, approach Slabs and Shoulder Reconstruction Work
Results
Less than $2,500,000 est. value
New Hartford, Utica, NY 13501

Peace Bridge Pier Re-Coating with Miscellaneous Concrete Repairs
Renovation
Bidding
Buffalo, NY 14213

Mid-Hudson Bridge Truss Hanger, Railing and Joint Rehabilitation
Post-Bid
Highland, NY

Replace Rte 14 Bridge Deck over Catherine Creek and Asphalt Concrete Reconstruction
Results
Less than $3,700,000 est. value
Montour Falls, NY 14865

North Span Deck Replacement and AET at Newburgh-Beacon Bridge
Post-Bid
Beacon, Newburgh, NY

Last Updated 06/10/2021 08:34 AM
Project Title

Replacement of Ledyard Road Over Little Salmon Creek Bridge

Physical Address View project details and contacts
City, State (County) NY   (Cayuga County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removing the existing superstructure and substructure and replacing with a 53’-6” multi-girder simple span bridge on a similar vertical and horizontal alignment. The integral abutment substructures with cantilevered wingwalls will be cast-in-place concrete founded on piles. Medium stone fill will be installed as slope protection. Approximately 250’ of full depth approach reconstruction will be completed on Ledyard Road. New bridge and approach guide railing will be installed within the project limits. Traffic will be maintained on an off-site detour during construction.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents