Similar Projects
Grafton Drive Pavement Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Slidell, LA 70458

Black Bayou Br Near Madisonville
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Covington, LA 70433

Spartan Drive Waterline Extension
Infrastructure
Bidding
$330,000 CJ est. value
Slidell, LA 70458

Koop Dr
Infrastructure
Bidding
$500,000 CJ est. value
Mandeville, LA 70471

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Comprehensive Cancer Care Clinic
New Construction, Infrastructure - 2,947 SF
Post-Bid
$400,000 est. value
Slidell, LA 70458

Playground Replacement for Pre-K and Middle School Age Groups at South Cameron High School Campus
Renovation
Results
$270,000 est. value
Grand Chenier, LA 70643

Civil Site Work for Three Artificial Turf Fields, STPSB Project
Infrastructure
Results
LA

Bonterra Subdivision, Phases 2 and 3
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Pearl River, LA 70452

US 90 : West Pearl Br Wire Rope Replacement
Infrastructure
Design
$500,000 CJ est. value
Lacombe, LA 70445

Secluded Grove LP Drainage
Infrastructure
Bidding
$393,114 CJ est. value
Madisonville, LA 70447

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Post-Bid
$36,000,000 CJ est. value
Slidell, LA 70458

US 190 Pump Station Force Main Upgrade
Infrastructure
Results
$1,230,201 CJ est. value
Covington, LA 70433

La 1091: US 190 to Cclub Blvd Sidewalks
Infrastructure
Design
$2,500,000 CJ est. value
Pearl River, LA 70452

Koop Drive Landscaping Upgrade
Infrastructure
Bidding
$20,000 CJ est. value
Mandeville, LA 70471

Last Updated 09/23/2022 11:53 AM
Project Title

RFQ Design - CDBG Possum Hollow Park Lighting

Physical Address View project details and contacts
City, State (County) Slidell, LA 70458   (Saint Tammany County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the City of Slidell, LA is soliciting Statements of Qualifications from highly qualified architectural/engineering services to design upgrades to Possum Hollow Park to include new LED light poles throughout the park. Firms must have experience in this type of work. The work will include the planning, design, and preparation of construction documents for bidding, bidding services, and construction administration. This is a Community Development Block Grant (CDBG) project; therefore, experience on other similar CDBG projects is a necessity. The firms should have familiarity with CDBG requirements for record keeping as relates to this type of work. It is the policy of the city to provide equal opportunity in its professional services contracts. The city encourages participation by Minority and Disadvantaged Business Enterprises firms. Interested parties should submit three hardcopies and one digital copy of their Statement of Qualification (SOQ) indicating their ability to do this type of work, including key personnel resumes and a listing of past and present related projects, with reference contacts Please use either the SF 330 or the SF255 form. Submitted SOQs shall be evaluated and ranked by an evaluation committee, per the criteria listed below: Criteria Weight o Firms CDBG experience. 10% o Firms project-specific experience and resources 35% o Firms east performance with coordination, cooperation, and ability to meet deadlines and budgets, and quality of work. 35% o Firms current work load and capability to begin this project quickly in a timely manner. 15% o DBE/MBE participation 5% The method of contractor selection has not been determined at this time.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents