Similar Projects
Mastodon Lake Dredging and Shoreline Restoration
Infrastructure
Design
$100,000 CJ est. value
Aurora, IL 60506

Sauk Valley Community College 2022 Abatement Project - West Toilet Rooms
Term Contract, Demolition, Infrastructure
Sub-Bidding
$79,600 CJ est. value
Dixon, IL 61021

Tree and Brush Thinning for Ten (10) Projects
Term Contract
Sub-Bidding
Geneva, IL 60134

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Central Dietary - Asbestos Work
Renovation
Results
Less than $150,000 est. value
Elgin, IL 60123

Asbestos Abatement Services
Term Contract
Results
$17,250 to $39,650 est. value
Galesburg, IL

Demolition of 3638 Rosemear Avenue
Demolition, Infrastructure
Sub-Bidding
$98,000 CJ est. value
Brookfield, IL 60513

ACM Removal
Post-Bid
Palos Hills, IL 60465

Asbestos Abatement at 2306-2308 and 2312 5th Avenue
Results
Moline, IL 61265

Demolition of Wastewater Treatment Structures
Demolition, Infrastructure
Sub-Bidding
$83,000 CJ est. value
Washington, IL 61571

Asbestos Abatement at Indian Creek High School
Post-Bid
Shabbona, IL 60550

CPS Talcott Elementary School ACM Abatement
Results
Chicago, IL 60622

River Forest Buildings Demolition Project
Demolition, Infrastructure
Sub-Bidding
$113,000 CJ est. value
River Forest, IL 60305

Asbestos Abatement
Renovation
Post-Bid
Oak Forest, IL 60452

Last Updated 08/17/2022 04:06 PM
Project Title

Scott County Housing Authority Lead Abatement

Physical Address View project details and contacts
City, State (County) Winchester, IL 62694   (Scott County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $169,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Remodeling work as follows:. 1. Base Bid - Abate lead based paint coated trim and other elements. Replace wood trim pieces with like shapes (ranch) and other indicated elements in similar configuration painted to match existing. Contractor shall follow workplace prep for a low-dust project (Chapter 8) and worker protection (Chapter 9) as specified in HUD Guideline for the Evaluation and Control of Lead-Based Paint Hazards in Housing, 2012. 2. Alternate Bid 1 - Provide full containment at all work areas. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. Project is Tax Exempt. Project is subject to Davis Bacon Prevailing Wages for Residential Construction. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders. Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all offers.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents