Similar Projects
Road Rehabilitation Project
Post-Bid
West Tawakoni, TX 75474

Quinlan Paving
Post-Bid
Quinlan, TX 75474

Southern Region Disaster Recovery Support BPA
Results

Caddo Downs Estates, Phase 2 Paving Improvements
Results
Caddo Mills, TX 75135

Verandah Phase 6 Paving Improvements
Post-Bid
Greenville, TX

Industrial Drive Improvements
Results
$808,510 est. value
Greenville, TX 75401

Caddo Mills ISD Middle School Paving/Lighting/Drainage
Post-Bid
Caddo Mills, TX 75135

Valor Farms Phase 1 (Formerly Known as Verandah, Phase 12) Paving Improvements
Results
TX

Install Continuous Turn Lane
Results
Less than $288,671 est. value
TX

2R Rehabilitation
Results
Less than $4,103,076 est. value
TX

2020 Street Improvement Program
Results
$1,541,146 est. value
Greenville, TX 75401

Ed Rutherford Drive Street Improvement
Results
$1,813,853 est. value
Greenville, TX 75401

Stonewall Street Improvements
Results
$3,563,500 est. value
Greenville, TX 75401

Hazard Elimination and Safety
Results
Less than $534,816 est. value
TX

Crack Seal
Results
Less than $224,180 est. value
TX

Last Updated 10/02/2020 10:10 AM
Project Title

Construct New Road

Physical Address View project details and contacts
City, State (County) TX   (Hunt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,220,693
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 168.100 1 104 6001 Removing Conc (Pav) Sy 1,693.000 2 104 6017 Removing Conc (Driveways) Sy 638.000 3 105 6008 Removing Stab Base And Asph Pav (6") Sy 18,364.000 4 106 6001 Obliterating Abandoned Road Sta 17.700 5 110 6001 Excavation (Roadway) Cy 142,826.000 6 110 6002 Excavation (Channel) Cy 6,891.000 7 112 6001 Subgrade Widening (Ord Comp) Sta 13.000 8 132 6003 Embankment (Final)(Ord Comp)(Ty b) Cy 63,399.000 9 132 6004 Embankment (Final)(Dens Cont)(Ty b) Cy 959.000 10 162 6002 Block Sodding Sy 26,136.000 11 164 6009 Broadcast Seed (Temp) (Warm) Sy 199,915.000 12 164 6011 Broadcast Seed (Temp) (Cool) Sy 199,915.000 13 164 6015 Straw/Hay Mlch Seed(Perm)(Rural)(Clay) Sy 199,915.000 14 168 6001 Vegetative Watering Mg 21,236.000 15 247 6076 Fl Bs (Cmp In Plc)(Ty d Gr 4) (6") Sy 38,415.000 16 247 6251 Fl Bs (Cmp In Pl)(Ty d Gr 4)(13") Sy 102,284.000 17 275 6001 Cement Ton 330.000 18 275 6079 Cement Treat (New Base)(7") Sy 102,284.000 19 310 6012 Prime Coat (Rc-250) Gal 38,775.000 20 316 6403 Aggr (Ty-b Gr-5 Or Ty-l Gr-5) Cy 4,999.000 21 316 6404 Aggr (Ty-Pb Gr-4 Or Ty-Pl Gr-4 Sac-a) Cy 4,999.000 22 316 6405 Asph (Ac-20-5tr Or Ac-20xp) Gal 38,765.000 23 354 6023 Plane Asph Conc Pav(0" To 4") Sy 21,340.000 24 360 6004 Conc Pvmt (Cont Reinf - Crcp) (10") Sy 35,722.000 25 400 6005 Cem Stabil Bkfl Cy 416.000 26 416 6001 Drill Shaft (18 In) Lf 180.000 27 416 6004 Drill Shaft (36 In) Lf 990.000 28 416 6031 Drill Shaft (Trf Sig Pole) (30 In) Lf 10.000 29 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 88.000 30 420 6013 Cl c Conc (Abut) Cy 134.000 31 422 6001 Reinf Conc Slab Sf 8,600.000 32 422 6015 Approach Slab Cy 407.200 33 425 6038 Prestr Conc Girder (Tx46) Lf 893.880 34 427 6004 Silicone Resin Paint Finish Sf 1,480.000 35 432 6033 Riprap (Stone Protection)(18 In) Cy 935.000 36 432 6044 Riprap (Conc)(Flume) Cy 113.000 37 450 6023 Rail (Ty Sstr) Lf 268.000 38 454 6004 Armor Joint (Sealed) Lf 228.000 39 462 6007 Conc Box Culv (5 Ft x 3 Ft) Lf 34.000 40 462 6019 Conc Box Culv (8 Ft x 4 Ft) Lf 170.000 41 462 6064 Conc Box Culv (8 Ft x 5 Ft)(Extend) Lf 160.000 42 462 6096 Conc Box Culv (8 Ft x 3 Ft) Lf 210.000 43 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 1,113.000 44 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 288.000 45 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 227.000 46 464 6009 Rc Pipe (Cl Iii)(42 In) Lf 319.000 47 464 6010 Rc Pipe (Cl Iii)(48 In) Lf 361.000 48 465 6021 Inlet (Compl)(Pco)(5ft)(None) Ea 6.000 49 465 6127 Inlet (Compl)(Psl)(Fg)(4ftx4ft-3ftx3ft) Ea 2.000 50 465 6128 Inlet (Compl)(Psl)(Fg)(4ftx4ft-4ftx4ft) Ea 7.000 51 465 6131 Inlet (Compl)(Psl)(Fg)(4ftx5ft-3ftx3ft) Ea 1.000 52 465 6284 Manhole (Compl)(Special) Ea 1.000 53 465 6338 Inlet (Compl)(Armor Curb Slot) Ea 20.000 54 466 6165 Wingwall (Fw - s) (Hw=4 Ft) Ea 2.000 55 466 6166 Wingwall (Fw - s) (Hw=5 Ft) Ea 2.000 56 466 6167 Wingwall (Fw - s) (Hw=6 Ft) Ea 1.000 57 467 6174 Set (Ty i)(s= 5 Ft)(Hw= 3 Ft)(6:1) (p) Ea 1.000 58 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (p) Ea 47.000 59 467 6419 Set (Ty Ii) (30 In) (Rcp) (4: 1) (c) Ea 3.000 60 467 6423 Set (Ty Ii) (30 In) (Rcp) (6: 1) (p) Ea 2.000 61 467 6454 Set (Ty Ii) (36 In) (Rcp) (6: 1) (p) Ea 4.000 62 467 6480 Set (Ty Ii) (48 In) (Rcp) (6: 1) (p) Ea 1.000 63 496 6004 Remov Str (Set) Ea 42.000 64 496 6050 Remov Str (Driveway Culvert) Ea 23.000 65 500 6001 Mobilization Ls 1.000 66 502 6001 Barricades, Signs And Traffic Handling Mo 18.000 67 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 150.000 68 506 6011 Rock Filter Dams (Remove) Lf 150.000 69 506 6038 Temp Sedmt Cont Fence (Install) Lf 5,625.000 70 506 6039 Temp Sedmt Cont Fence (Remove) Lf 5,625.000 71 508 6002 Constructing Detours (Ebss) Sy 1,410.000 72 512 6021 Port Ctb (Des Source)(Low Prof)(Ty 1) Lf 5,580.000 73 512 6022 Port Ctb (Des Source)(Low Prof)(Ty 2) Lf 120.000 74 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 5,580.000 75 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 120.000 76 529 6005 Conc Curb (Mono) (Ty Ii) Lf 7,196.000 77 529 6008 Conc Curb & Gutter (Ty Ii) Lf 270.000 78 530 6004 Driveways (Conc) Sy 643.000 79 530 6005 Driveways (Acp) Sy 3,965.000 80 530 6008 Turnouts (Acp) Sy 30.000 81 531 6002 Conc Sidewalks (5") Sy 1,803.000 82 531 6006 Curb Ramps (Ty 3) Ea 6.000 83 531 6017 Curb Ramps (Ty 22) Ea 24.000 84 533 6001 Rumble Strips (Shoulder) Lf 30,824.000 85 540 6002 Mtl w-Beam Gd Fen (Steel Post) Lf 425.000 86 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 4.000 87 540 6016 Downstream Anchor Terminal Section Ea 3.000 88 544 6001 Guardrail End Treatment (Install) Ea 3.000 89 560 6004 Mailbox Install-s (Twg-Post) Ty 2 Ea 21.000 90 618 6070 Condt (Rm) (2") Lf 280.000 91 618 6078 Condt (Rm) (4") Lf 415.000 92 618 6079 Condt (Rm) (4") (Bore) Lf 370.000 93 620 6009 Elec Condr (No.6) Bare Lf 1,240.000 94 620 6011 Elec Condr (No.4) Bare Lf 175.000 95 620 6012 Elec Condr (No.4) Insulated Lf 345.000 96 621 6005 Tray Cable (4 Condr) (12 Awg) Lf 1,525.000 97 624 6010 Ground Box Ty d (162922)w/Apron Ea 3.000 98 628 6188 Elc Srv Ty d 120/240 070(Ns)Ss(e)Sp(o) Ea 2.000 99 636 6001 Aluminum Signs (Ty a) Sf 50.000 100 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 64.000 101 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 10.000 102 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 2.000 103 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(u) Ea 4.000 104 644 6037 In Sm Rd Sn Sup&Am Tys80(1)Sa(u-Wc) Ea 12.000 105 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 13,510.000 106 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 22,070.000 107 666 6005 Refl Pav Mrk Ty i (w)4"(Dot)(090mil) Lf 298.000 108 666 6035 Refl Pav Mrk Ty i (w)8"(Sld)(090mil) Lf 10,190.000 109 666 6047 Refl Pav Mrk Ty i (w)24"(Sld)(090mil) Lf 1,852.000 110 666 6053 Refl Pav Mrk Ty i (w)(Arrow)(090mil) Ea 38.000 111 666 6077 Refl Pav Mrk Ty i (w)(Word)(090mil) Ea 27.000 112 666 6101 Ref Pav Mrk Ty i(w)36"(Yld Tri)(090mil) Ea 5.000 113 666 6167 Refl Pav Mrk Ty Ii (w) 4" (Brk) Lf 8,040.000 114 666 6170 Refl Pav Mrk Ty Ii (w) 4" (Sld) Lf 33,755.000 115 666 6205 Refl Pav Mrk Ty Ii (y) 4" (Brk) Lf 6,040.000 116 666 6207 Refl Pav Mrk Ty Ii (y) 4" (Sld) Lf 36,753.000 117 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 1,242.000 118 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 647.000 119 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 1,900.000 120 680 6002 Install Hwy Trf Sig (Isolated) Ea 3.000 121 682 6001 Veh Sig Sec (12")Led(Grn) Ea 22.000 122 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 9.000 123 682 6003 Veh Sig Sec (12")Led(Yel) Ea 22.000 124 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 18.000 125 682 6005 Veh Sig Sec (12")Led(Red) Ea 22.000 126 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 9.000 127 682 6018 Ped Sig Sec (Led)(Countdown) Ea 16.000 128 682 6049 Backplate w/Refl Brdr(4 Sec) Ea 9.000 129 682 6060 Backplate w/Refl Brdr(3 Sec) Ea 22.000 130 684 6028 Trf Sig Cbl (Ty a)(14 Awg)(2 Condr) Lf 3,020.000 131 684 6030 Trf Sig Cbl (Ty a)(14 Awg)(4 Condr) Lf 3,020.000 132 684 6033 Trf Sig Cbl (Ty a)(14 Awg)(7 Condr) Lf 5,565.000 133 684 6049 Trf Sig Cbl (Ty a)(16 Awg)(3 Condr) Lf 2,570.000 134 686 6035 Ins Trf Sig Pl Am(s)1 Arm(32')Lum Ea 1.000 135 686 6057 Ins Trf Sig Pl Am(s)1 Arm(55') Ea 1.000 136 686 6195 Ins Trf Sig Pl Am(s)2 Arm(50-44')Lum Ea 1.000 137 686 6219 Ins Trf Sig Pl Am(s)2 Arm(55-40')Lum Ea 2.000 138 688 6002 Ped Detect Push Button (Standard) Ea 16.000 139 3076 6015 d-Gr Hma Ty-c Pg64-22 Ton 24,159.000 140 5001 6002 Geogrid Base Reinforcement (Ty Ii) Sy 138,469.000 141 6058 6001 Bbu System (External Batt Cabinet) Ea 1.000 142 6061 6001 Gps Communications Unit Ea 1.000 143 6094 6017 Pull Boxes (Ty d) Ea 11.000 144 6185 6002 Tma (Stationary) Day 80.000 145 6306 6002 Vivds Cam Assy Fxd Lns Ea 11.000 146 6306 6006 Vivds Temporary Ea 1.000 147 6306 6007 Vivds Cabling Lf 2,170.000 148

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents