Similar Projects
Intersections - Buice at Spruill - Roundabout - City of Johns Creek
Infrastructure
Conception
$1,300,000 CJ est. value
Johns Creek, GA 30022

New Cut Road Mixed-Use Development
New Construction, Infrastructure - 104,500 SF
Conception
$60,000,000 CJ est. value
Braselton, GA 30517

Water Meter Replacement, July 2022
Infrastructure
Design
$472,475 CJ est. value
McCaysville, GA 30555

Water Meter Replacement, July 2022
Infrastructure
Design
$472,475 CJ est. value
McCaysville, GA 30555

SPIP Megasite Clearing and Grading
Infrastructure
Bidding
$10,000,000 CJ est. value
Bloomingdale, GA 31302

Bridge Rehabilitation
Infrastructure
Bidding
$250,000 CJ est. value
Helena, GA 31037

Naval Submarine Base Kings Bay - Entrance Channel, Maintenance Dredging
Infrastructure
Sub-Bidding
$25,000,000 CJ est. value
Kings Bay Base, GA 31558

Building Demolition Services
Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Tifton, GA 31794

Line Creek Transmission Main and Distribution System
Infrastructure
Post-Bid
$8,500,000 est. value
GA

Piedmont Regional Industrial Park Site Grading
Infrastructure
Post-Bid
GA

Water Meter ERT's
Results
Douglas, GA

FY 2021 Waterline Upgrades
Results
$3,000,000 est. value
Athens, GA

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Savannah, GA 31405

Highway 16 East Warehouse
New Construction, Infrastructure - 479,520 SF
Pending Verification
$50,000,000 CJ est. value
Newnan, GA 30263

River Oaks Phase 2
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Evans, GA 30809

Last Updated 08/09/2022 08:39 AM
Project Title

Mineral Springs Road Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Blue Ridge, GA 30513   (Fannin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,192,937 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 9, 2022. The project has been awarded with the amount of $1,192,936.54. SCOPE OF WORK Under this project, the Contractor shall furnish all labor, equipment and materials necessary to construct the proposed sewer system improvements as shown on the construction drawings. More specifically, the work shall consist of +- 2,060 LF of 8" to 8" and +- 5,400 LF of 8" to 12" sanitary sewer rehabilitation utilizing pipebursting and/or CIPP rehabilitation methods, +- 195 VF manhole rehabilitation, +- 10 external manhole repairs, and other miscellaneous items. Time allotted for completion of work is 120 consecutive calendar days. A Bidder's Proposal will not be considered by the Owner unless the Bidder is on record with Carter & Sloope, Inc. as having purchased and received complete Bidding Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents