Similar Projects
15th Avenue North to 8th Avenue North Rehabilitation
Bidding
MN

Reclaim and Overlay
Bidding
Duluth, MN 55811

2021 Stabilize And Pave Road Bed
Post-Bid
MN

2021 Roads Maintenance
Renovation
Post-Bid
Red Wing, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Hwy 52 Zumbrota to Cannon Falls
Results
$54,000,000 to $60,000,000 est. value
MN

2021 Paving
Bidding
Hibbing, MN

TH 7/22 and Montana Avenue Northwest Crossing Improvements
Post-Bid
$290,618 est. value
Hutchinson, MN 55350

Grading, Bituminous Surfacing and ADA Improvements
Results

Overlay Street Rehabilitation
Bidding
$1,000,000 est. value
Rochester, MN

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Grading, Bituminous Mill and Overlay, Lighting, ADA Improvements
Results
MN

Chip Seal Street Rehabilitation
Bidding
$1,000,000 est. value
Rochester, MN

2021 Pavement Rehabilitation
Post-Bid
Jordan, MN

Concrete Pavement, Concrete Pavement Rehabilitation
Results
MN

Last Updated 03/17/2021 09:35 AM
Project Title

2021 Bituminous Surfacing

Physical Address View project details and contacts
City, State (County) Willmar, MN   (Kandiyohi County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,647,890
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous Surfacing projects for county roads at various locations in Kandiyohi County. Combined estimated quantities of work are: Remove Concrete Curb - 116 Lin Ft, Remove Concrete Walk - 1276 SqFt, Remove Bituminous Pavement - 1480 SqFt, Mill Bituminous Surface - 35690 Sq Yd, Bituminous Mixture - 39592 Ton, Shoulder Base Aggregate Class 1 - 9631 Ton, Concrete Walk - 2756 SqFt, Boulevard Topsoil Borrow- 363 Cu Yd, Concrete Curb and Gutter - 116 Lin Ft, Truncated Domes - 328 SqFt, Interim Pavement Marking - 5 LS, Bituminous Material for Shoulder Tack - 5201 Gal, Hydraulic Bonded Fiber Matrix (BFM) - 7000 LB, Striping Paint - 87569 Lin Ft, and other miscellaneous construction items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents