Similar Projects
Annular Steel Culvert
Term Contract
Bidding
Boulder, CO

Ultra Violet (UV) Cured-in-Place-Pipe (CIPP) Lining
Term Contract
Bidding
Broomfield, CO

North Public Road Sanitary Sewer Main Extension
Post-Bid
Lafayette, CO 80026

South Boulder Road Widening and Multi-modal Improvement Project
Post-Bid
Lafayette, CO 80026

Cottontail Trail Repair
Results
Boulder, CO 80301

Permanent District Marker Monumentation Phase 1
Results
Broomfield, CO 80537

George Diciero Parking Lot Replacement
Bidding
Broomfield, CO

Rec - 101A Racquetball Conversion
Post-Bid
$600,000 est. value
Boulder, CO 80309

Carr Park Playground Replacement
Results
$350,000 to $390,000 est. value
Longmont, CO 80501

Notice# 21-20-UCB000275-Site_Asphalt Repairs 2021
Bidding
Less than $110,000 est. value
Boulder, CO

Statewide Asphalt
Post-Bid

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Milling and Paving of Boulder Yard
Bidding
Boulder, CO 80302

Ridglea Way Water Main Replacement
Post-Bid
Boulder, CO 80301

Remodel of Wilson Community Gardens
Results
Lafayette, CO 80026

Reported 03/05/2020 12:00 AM
Project Title

Ponderosa Community Stabilization Project

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor services in connection with the Ponderosa Community Stabilization Project. The city proposes to retain one or more highly qualified, capable firms to act as Contractor for initial replacement of infrastructure as outlined in the Tec Docs referred to as Phase 1 with the potential to extend to additional phases.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents