Similar Projects
Im Sports-West Renew/Replace HVAC Controls - Michigan State University
Renovation
Conception
$860,000 CJ est. value
East Lansing, MI 48824

Golf Practice Facility
New Construction
Design
Rochester, MI

The 9 Dome: Multi-Sport Training Facility
New Construction - 34,000 SF
Design
Southfield, MI 48075

Athletic Complex Bid Pack No.3
New Construction
Post-Bid
Grand Blanc, MI 48439

Indoor Athletic Field House
New Construction
Post-Bid
Brighton, MI

2018 Bond Phase 3A Athletic Field Complex Site
Renovation
Results
Sanford, MI

Taylor Recreation Center Locker Rooms and Front Desk
New Construction
Results
Taylor, MI

2022 Bond - Pentwater Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$17,075,000 CJ est. value
Pentwater, MI 49449

Bond 2020 - Goodrich Area Schools
New Construction, Renovation, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Goodrich, MI 48438

Burgtorf Building - 2022 Bond - Kearsley Community Schools
Renovation
Design
$2,000,000 est. value
Flint, MI 48506

PHS Outdoor Athletic Upgrades
Addition
Post-Bid
Pontiac, MI 48340

Jenison Junior High School Additions, Renovation and Athletic Facility Project
Renovation, Addition
Results
Georgetown Township, MI 49428

Athletic, Arts, Playground, and Site Improvements - 2022 Bond - Warren Consolidated Schools
Renovation, Infrastructure
Pending Verification
$16,250,000 CJ est. value
Warren, MI 48093

Phase 2 Bond Projects - Montabella Community Schools
Addition
Design
$6,000,000 CJ est. value
Blanchard, MI 49310

Hartland Middle School at Ore Creek New Athletic Field
New Construction
Post-Bid
Hartland, MI 48353

Last Updated 03/06/2023 02:05 PM
Project Title

2022 Clara Bolen - Gym Floor Replacement

Physical Address View project details and contacts
City, State (County) Tawas City, MI 48763   (Iosco County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $104,050 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

**Note (12/08/2022) - The project is temporarily postponed until the first of the year 2023. Proposal dates will be advised through the second Addendum. The purpose of this Request for Proposals is to seek the service of a qualified professional flooring contractor to remove existing VCT floor and install new gymnasium flooring at the Clara Bolen Elementary School. Question Deadline 01/30/2023 at 5:00 PM ET RFIs must be submitted to the owner, If questions arise after this date, you must clarify your bid and/or supply a voluntary alternate so the owner can equally review and address all bids received. Tawas Area Schools Brandon Lichota 255 W. M 55 Tawas City, MI 48763 P: 989.906.1311

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents