Similar Projects
2022 Lead Service Line Replacement
Infrastructure
Bidding
Hartford, WI

A: 3rd Avenue/Monroe Street/pine Street and Maple Street Reconstruction, B: 3rd Avenue Water Service Reconfiguration, C: 4th Avenue Sanitary Sewer
Infrastructure
Bidding
$200,000 est. value
Fredonia, Madison, Milwaukee, Pittsville, WI 53774

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Bridge Deck Surface Rehabilitation, Cleaning and Epoxy Sealing
Post-Bid
Barron, WI

Perry to Newman 36-Inch Transmission Water Main
Results
Less than $11,000,000 est. value
Racine, WI 53406

Central Campus Utilities - General
Results
Less than $3,000,000 est. value
Whitewater, WI 53190

Forest Hill Manor Water Relay
Infrastructure
Bidding
$300,000 est. value
Oak Creek, WI

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

Waukesha Water Utility - Contract Package 2B
Results
Waukesha, WI

Market and Gohres Street Utilities
Infrastructure
Bidding
$400,000 est. value
La Crosse, WI

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

Utility Structure Rehabilitation and Replacement
Results
$1,550,000 est. value
Janesville, WI

Springfield - Waterford, STH 83 to STH 20
Infrastructure
Bidding
$8,000,000 to $8,999,999 est. value
Greendale, WI 53129

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Last Updated 04/26/2022 07:50 AM
Project Title

Kinne Street Water Main

Physical Address View project details and contacts
City, State (County) Ellsworth, WI 54011   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of providing all labor, materials, tools, and equipment necessary for construction of roadway and utility replacement. The major work items include installation of 8-inch HDPE Horizontal Directional Drilling 690 LF, Water Services 2 Each, 6-inch Gate Valve and Box 8 each, Hydrant 3 Each, and Hot Mix Asphalt Pavement 30 Ton.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents