Similar Projects
Flooring Renovations - Excelencia and Gateway
Renovation
Post-Bid
Phoenix, AZ 85006

The Federal Aviation Administration (FAA) Has a Requirement for Carpet Replacement at The Good Year and Deer Valley Air Traffic Control Towers.
Term Contract
Post-Bid
Phoenix, AZ

Flooring Replacement at Desert View, Roadrunner, Cactus Wren, Abraham Lincoln, Cholla, Central Registration, Chaparral, and Ironwood
Results
Phoenix, AZ 85020

Demo and Replace Flooring, Phoenix Rearing Facility
Demolition, Term Contract
Results
$250,000 to $500,000 est. value
Phoenix, AZ 85040

Cach-Admin Office Asbestos Tile Removal
Term Contract
Post-Bid
Chinle, Tsaile, AZ 86507

Floor Covering Products and Services
Infrastructure
Results
$25,000 CJ est. value
Phoenix, AZ 85004

Flooring Replacements
Infrastructure
Post-Bid
Glendale, AZ

Carpet Replacement for Tempe Center for the Arts
Alteration
Post-Bid
Tempe, AZ 85281

Hardwood Floor Services
Term Contract
Post-Bid
Phoenix, AZ

Flooring Repair and Installation Services
Term Contract
Post-Bid
Phoenix, AZ

VCT, LVT, Polished Concrete and Gym Flooring Cleaning
Alteration
Post-Bid
Phoenix, AZ 85043

Carpet Cleaning
Alteration
Post-Bid
Phoenix, AZ

Truncated Dome Tiles Requirements Contract
Term Contract
Post-Bid
Phoenix, AZ 85003

Truncated Dome Tiles
Term Contract
Post-Bid
Phoenix, AZ

Carpet Replacement at the Good Year and Deer Valley Air Traffic Control Towers
Renovation
Post-Bid
$150,000 CJ est. value
Phoenix, AZ 85004

Last Updated 11/10/2022 04:22 PM
Project Title

Maricopa County Renovations of Central Courts - 11th Floor

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85003   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,623,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located on the 11th floor of the existing Maricopa County Superior Court Central Court Tower, 201 West Jefferson Street, Phoenix, Az 85003. The existing floor plate is 19,378 SF and demolition is 95% complete. The renovation work includes four each: Criminal Courtrooms Jury Deliberation Rooms Judicial Suites Judges Chambers. There is a detention component in the Maricopa County Sheriffs Office (MCSO) holding area. The new design also includes single use Toilet Rooms, Multiple Fixture Restrooms, Evidence Storage and a Public component consisting of Interview Rooms, and Victim Viewing Rooms. The Security Electronics design ties into Court Security in the Lobby of the Central Court Tower and the MCSO Control Room in South Court Tower. The work takes place in an operational court tower and most of the work will need to take place after business hours. Additional items not included in the drawings and specifications include the following: 1. All card readers are Owner Provided/Contractor Installed. 2. A mircroprocessor based space sensor shall be capable of (+/-) 2 degrees F. 3. An asbestos Survey and Lead based paint survey is included in the Appendix of the project Manual. 4. The project requires pre-construction coordination with the Court Equipment Contractor under contract with the Judicial Branch. Contract duration: 300 days

Details

19,378 SF.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents