Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Septic System Replacement
Alteration
Design
WA

Rehabilitate Wastewater System
Alteration
Bidding
Port Angeles, WA 98363

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Bidding
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

North East 20th Avenue Trunk
Infrastructure
Bidding
Vancouver, WA 98686

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Water and Sewer Department General Materials
Infrastructure
Bidding
Pullman, WA

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

Mercer Island and Enatai Interceptor Upgrade-Conveyance Improvements
Infrastructure
Results
$52,417,000 est. value
WA

Cure in Place Pipe
Infrastructure
Bidding
Spokane, WA

Reported 03/22/2022 12:00 AM
Project Title

Homeowner On-Site Septic System

Physical Address View project details and contacts
City, State (County) WA   (Grays Harbor County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project will provide sanitation facilities to a private home owned by a member of the Quinault Tribe, located on trust land in Taholah, WA on the Quinault Reservation. The proposed system consists of solid sewer pipe with a clean out, a two-compartment concrete septic tank, a concrete pump chamber, pump and controls, sewer force main transport pipe, and a sand mound drain field with three distribution lateral pipes. All excavation and backfill to be included in costs. Contractor is responsible for utility locates and necessary permits. Contractor must be a licensed septic installer in the state of Washington. The septic system installation shall include: - Mobilization and Demobilization - Installation of approximately 15 linear feet of 4-inch SDR 35 PVC solid sewer pipe - Installation of one underground double-sweep cleanout - Installation of a 1,150-gallon concrete septic tank - Installation of a 1,150-gallon concrete pump chamber - Installation of approximately 60 linear feet of 1.5-inch Schedule 40 PVC effluent transport line - Installation of a sand mound drain field

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents