Last Updated | 08/17/2022 03:31 PM |
Project Title | CTH A Bike Trail, West Richmond Way to West 4th Street, Constr/Paved Bike Ped Trail/TAP |
Physical Address | View project details and contacts |
City, State (County) | New Richmond, WI 54017 (Saint Croix County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CTH A Bike Trail, W. Richmond Way to W. 4th Street, Constr/Paved Bike Ped Trail/TAP, St. Croix County, Wisconsin The work, in general, will include the approximate quantities and items listed below: Clearing & Grubbing 5 sta Excavation 1,320 cy Borrow Excavation 2,580 cy Crushed Aggregate Base 980 cy Concrete Curb and Gutter 120 lf Concrete Sidewalk 1,050 sf Hot Mix Asphalt 4,150 sy Rectangular Rapid Flashing Beacon 2 ea Beam Guard 520 lf Energy Absorbing Terminal 2 ea Modular Block Retaining Wall 2,230 sf Chain Link Fence 775 lf Pavement Marking 216 lf Traffic Control 1 ls Storm Sewer (12", 18", and 24") & Appurtenances 259 lf Erosion Mat 3,400 sy Topsoil, Turf, Grasses 5,500 sy Concrete Box Culvert Extension: Remove Structure 1 ea Excavation for Structure 1 ls Backfill Structure 455 ton Breaker Run Stone 35 cy Adhesive Anchors 30 ea Concrete Masonry Culvert 59 cy Bar Steel Reinforcement 5,150 lb Bar Steel Coated Reinforcement 4,490 lb Railing Tubular 14 lf Rubberized Membrane Waterproofing 19 sy Geotextile, Type C 105 sy Temporary Pre-Cast Concrete Barriers 150 lf The proposals shall be submitted on the forms furnished with the specif cations. Each proposal shall be accompanied by a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. This project is funded in part with a WisDOT Transportation Alternatives Program (TAP) and is Federally funded. Federal Davis-Bacon Act wage rates are applicable to this project per Federal Labor Provisions (4010). Attention of bidders is particularly called to the requirements as to condition of employment to be observed and minimum wage and fringe rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. We encourage MBEs, DBEs, and WBEs to submit bid proposals. The solicitation of subcontractors must evidence a good faith effort to obtain bids from MBEs, DBEs and WBEs, such efforts to be documented. Proposals shall not be withdrawn for a period of 60 days after the date of opening. The City of New Richmond reserves the right to reject any or all of the proposals and to waive any informalities therein. The Work will be substantially complete on or before May 1, 2023 |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |