Similar Projects
HMA Overlay, Preventive Maintenance
Infrastructure
Design
$2,770,641 CJ est. value
Waveland, IN 47989

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$2,770,641 CJ est. value
Waveland, IN 47989

Constitution Row Concrete Pavement Repairs
Infrastructure
Bidding
$2,000,000 CJ est. value
Crawfordsville, IN 47933

Constitution Row Concrete Pavement Repairs
Infrastructure
Bidding
$2,000,000 CJ est. value
Crawfordsville, IN 47933

Comfort Drive Reconstruction
Infrastructure
Post-Bid
$5,300,000 to $5,400,000 est. value
Crawfordsville, IN

CCMG Resurfacing on CR 775 East from US 136 to CR 500 South
Infrastructure
Post-Bid
Crawfordsville, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Repair Or Replace Joints - I 74
Infrastructure
Design
$312,411 CJ est. value
Crawfordsville, IN 47933

2022 Community Crossings Paving Program
Infrastructure
Post-Bid
Crawfordsville, IN

Bridge Maintenance and Repair
New Construction
Results

Bridge Deck Replacement - Bridges 29, 205 and 207
Demolition, New Construction, Infrastructure
Post-Bid
$662,000 CJ est. value
Crawfordsville, IN 47933

Pavement Patching
Infrastructure
Results
Crawfordsville, IN

Bridge Deck Replacement
New Construction, Infrastructure
Results
IN

IDIQ District Wide Bridge Maintenance
New Construction, Infrastructure
Results

Last Updated 10/17/2022 01:34 AM
Project Title

Bridge Deck Overlay

Physical Address View project details and contacts
City, State (County) Waveland, IN 47989   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $780,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2.34 mi E of SR 63, over Branch Coal Creek As of October 17, 2022, the project is in Final Planning status. Anticipated letting date is January 19, 2023. INDOT - Bridge Deck Overlay *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents