Similar Projects
Detention Pond Improvement - Pond 2 - PWFC003.0-16 - Village of Mount Prospect
Infrastructure
Conception
$835,000 CJ est. value
Mount Prospect, IL 60056

Detention Pond Improvement - Pond 6 - PWFC004.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Asbestos Abatement Work at the Forest View Educational Center (FVEC)
Term Contract, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Arlington Heights, IL 60005

Doolittle Elementary School Lead Based Paint Mitigation Laundry Room
Term Contract, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Chicago, IL 60616

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Crawl Space Abatement
Alteration
Post-Bid
Cicero, IL 60804

Lead Based Paint Mitigation in Engineer's Office
Alteration
Results
Chicago, IL 60624

Asbestos Abatement at Jefferson Elementary School
Alteration
Results
Niles, IL 60714

Detention Pond Improvement - Pond 6A - PWFC005.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Demolition of 14101 and 14249 Wolf Road
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Orland Park, IL 60462

On-Call Environmental Services
Term Contract
Post-Bid
Chicago, IL 60661

Tefft MS Fire Alarm Replacement, First and Second Floor Asbestos Abatement
Alteration
Results
Streamwood, IL 60107

Hubbard High School - Chemical Disposal
Term Contract
Sub-Bidding
Chicago, IL 60629

Asbestos Abatement Services
Alteration
Post-Bid
Oak Forest, IL 60452

Lyons Township HS 2022 Asbestos Abatement
Alteration
Results
La Grange, IL 60525

Last Updated 02/22/2023 01:46 PM
Project Title

Asbestos Abatement Project

Physical Address View project details and contacts
City, State (County) Crestwood, IL 60445   (Cook County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Asbestos Flooring Material Removal at: Kolmar School - 4500 W. 143rd Street, Crestwood Il, 60418 The Board Reserves the Right to Waive Any Formality or to Accept Any Informality and to Reject Any or All Bids. Midlothian School District #143 (District #143) is seeking bids from qualified asbestos abatement Contractors to perform the removal and disposal of identified asbestos containing materials as specified from Kolmar Elementary School. The objective of this project is to remove asbestos containing materials in a safe, legal, and costeffective manner. This asbestos abatement specification was developed to provide contractual procedures for an asbestos abatement Contractor to complete the project according to the rules and regulations of the Environmental Protection Agency (EPA) and the Illinois Department of Public Health (IDPH) Asbestos Abatement Act. Contractors are expected to review this specification and inspect the facilities thoroughly prior to submitting their bid. If a Contractor discovers an item that is not covered under the scope of work, the Contractor shall make it known to the Designer prior to submitting his bid. No extras shall be allowed during this project. Therefore, it is the Contractor's responsibility to become completely familiar with the project, its requirements and overall objective. If the Contractor fails to disclose an item that should/could have been discovered during his review of this specification and from inspection of the facility, the Contractor shall not receive an "extra" fee to perform the work once the contract is awarded. It is recognized that Contractors often bid low and hope for extras. This will not occur on this project. The Contractor is expected to investigate existing conditions prior to bidding and to bring to light any concerns or anticipated additions. If new items are identified, they will be formally addressed in the scope of work through addenda, to be competitively bid, allowing all Contractors to have the same chance to bid the new items. Contractor shall construct all containment barriers per IDPH. Contractor shall remove all layers of underlayment (stage), floor tile, leveling compound and associated mastics/glues. Contractor shall remove and dispose of leveling compound (all layers) with no exceptions as ACM. Leveling compound shall be scarified/ground until complete removal. Contractor shall remove vinyl base cove as non-asbestos containing material. Contractor shall utilize mechanical (i.e., grinders or similar) means to remove the black mastic and any leveling compound associated with the flooring in Area #1. All shall work shall be performed utilizing wet methods. No chemical solvent shall be utilized on this project. Contractor shall remove wood underlayment on stage in its entirety including all fasteners (i.e., screws, nails, staples). Contractor shall protect new flooring not in the scope of work per IDPH and from damage. Contractor shall be responsible for any damage to existing flooring to remain resulting from their work.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents