Similar Projects
Chrome Works
New Construction
Design
$25,000,000 est. value
Salt Lake City, UT 84101

Brix
New Construction - 204,401 SF
Design
$10,000,000 CJ est. value
Salt Lake City, UT 84101

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Bidding
$40,000,000 CJ est. value
Salt Lake City, UT 84101

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Bidding
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Slate Multi-Family Mixed Use
New Construction - 123,140 SF
Post-Bid
$5,094,463 est. value
Salt Lake City, UT 84101

Sunset Gardens
New Construction - 89,912 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Midvale, UT 84047

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT 84108

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

Sage Valley Apartments
New Construction - 704,593 SF
Construction
$78,000,000 est. value
West Valley City, UT 84044

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

New Multi-Use School in Herriman
New Construction, Infrastructure - 93,186 SF
Bidding
$100,000 CJ est. value
Herriman, UT 84096

The Richmond Flats
New Construction - 1,700 SF
Post-Bid
$9,730,000 est. value
Salt Lake City, UT 84106

Last Updated 01/04/2023 04:31 PM
Project Title

Loft 962

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84101   (Salt Lake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding Closed, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 4, 2023, no contractor has been awarded. This is still pending. This is a 4-story, 23,433 SF multi-family building containing 36 apartment units. The anticipated start date is 01/24/2023 with an approximate 10-12 month duration. The scopes include, but are not limited to: Final Cleaning, SWPPP, Demolition, Concrete, Masonry, General metal fabrication, Rough Carpentry, Insulation, EFIS, Doors & Hardware, Store Front, Drywall, Flooring, Tile/Flooring, Painting, Specialties, Plumbing, HVAC, Electrical, Earthwork, Asphalt, Landscape etc.

Details

4 Stories Above Grade, 23,433 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents