Similar Projects
Sidewalk Removal and Replacement Concrete Flatwork
Infrastructure
Post-Bid
West Dundee, IL

2021 Street Resurfacing and Sidewalk Program
Infrastructure
Post-Bid
Batavia, IL

Rotary Plaza Pedestrian Bridge Removal and Walkway Reconstruction
Results
Aurora, IL 60505

2020 MFT Sidewalk Repair Program
Results
Less than $24,876 est. value
Carpentersville, IL 60110

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

2021 Various Parking Lot Rehab
Infrastructure
Post-Bid
Aurora, IL

2020 Alley and Parking Lots Maintenance
Results
Elgin, IL 60120

2021 Sidewalk Cutting
Alteration
Post-Bid
Aurora, IL

2020 Street Program Wellington Laurel
Renovation
Results
Elgin, IL 60120

Parking Enforcement Services for the Division of Motor Vehicle Parking Services
Infrastructure
Post-Bid
Aurora, IL

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Curb and Gutter Installations, 4" PCC Sidewalk Installations, 6" PCC Sidewalk Installations
Infrastructure
Post-Bid
Algonquin, IL

Pavement Patching Program 2020 and Police Department Parking Lot
Results
Pingree Grove, IL 60140

2020 Sidewalk and Curb Maintenance
Results
Geneva, IL 60134

Sunset Community Center Parking Lot Improvements
Results
Geneva, IL 60134

Last Updated 10/01/2021 09:27 AM
Project Title

Downtown Bike Path Rehabilitation

Physical Address View project details and contacts
City, State (County) Aurora, IL 60506   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $309,370
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed Improvement: HMA bike path partial depth mill and replacement with either colored PCC or HMA with colored epoxy coating, curb and gutter, HMA pavement replacement and other miscellaneous appurtenances. Option 1 shall be comprised of milling 3” off the existing bike path, replacement with 3” of HMA, installing green MMA coloring and MMAX yellow striping and MMAX white symbols. Option 2 shall be comprised of milling 5” off the existing bike path and 6” at driveway crossings and replacement with 5” or 6” green integral PCC and installing PCC sidewalk. The road crossings will consist of milling 3” off the existing bike path, replacement with 3” of HMA, installing green MMA coloring and MMAX yellow striping and MMAX white symbols.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents