Similar Projects
Last Updated | 11/01/2021 08:52 AM |
Project Title | Berkshire Villas Phase 2, 2021 Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Bloomfield Hills, MI (Oakland County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install via pipe bursting, approximately 3,216 lft of eight (8”) inch diameter HDPE water main to replace existing six (6”) inch diameter and eight (8”) inch diameter water mains. Install via open-cut excavation, approximately 64 lft of eight 8” diameter HDPE water main to replace existing six (6”) inch diameter and existing eight (8”) inch water mains. This project will include the installation of five (5) new hydrants and five (5) new gate valve & wells, and the reconnection of (30) water services. The project shall include all pavement restoration, surface restoration, traffic control, soil erosion control and other miscellaneous items necessary to complete the work as indicated on the Plans and Specifications. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |