Similar Projects
Township & Fire Department Offices New Hall
New Construction
Conception
Walhalla, MI

New Central Fire Station
New Construction - 22,000 SF
Conception
Port Huron, MI

Fire Stations 1 & 3 Remodels
Renovation
Design
Auburn Hills, MI 48326

Oakland County Sheriff Substation
Renovation - 7,300 SF
Design
Commerce Township, MI

Solar and Energy Storage Installations for City Sites
Renovation, Infrastructure
Bidding
$140,000 CJ est. value
Ann Arbor, MI 48104

New Fire Station 4 - City of Ann Arbor
Demolition, New Construction, Infrastructure - 12,097 SF
Post-Bid
$6,000,000 CJ est. value
Ann Arbor, MI 48104

Renovations To Fire Station 2, 3303 Baldwin Rd
Renovation
Post-Bid
$450,000 est. value
Grand Blanc, MI 48439

Fire Station 32 Fascia Project
Renovation
Results
Brighton, MI

Fire Station 1 Renovation
Renovation - 8,381 SF
Results
Ann Arbor, MI

Law Enforcement Facility - County of Oakland
New Construction, Infrastructure - 105,000 SF
Pending Verification
$59,500,000 CJ est. value
Pontiac, MI 48342

Fire Station 2 Refurbishment - Chesterfield Township
Renovation
Pending Verification
$2,000,000 CJ est. value
Chesterfield, MI 48047

Kollen Park Station Renovation
Renovation
Conception
Holland, MI 49423

New Fire Station & Existing Station Remodel
New Construction, Renovation - 30,000 SF
Design
Holland, MI 49423

Facility Maintenance for DPD Lyndon Facility
Renovation
Post-Bid
$650,000 est. value
Detroit, MI 48227

Design Build Services for Fire Training Tower
New Construction
Results
Southfield, MI

Last Updated 03/24/2023 08:14 AM
Project Title

Clawson Police Department Locker Room Renovation

Physical Address View project details and contacts
City, State (County) Clawson, MI 48017   (Oakland County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovation of the locker room suite at the Clawson Police Dept., including locker rooms, toilet/ shower rooms, a storage room and a corridor. Contact Information: August Gitschlag 248-435-4500 ext. 118 agitschlag@cityofclawson.com Matt Berge mberge@aewinc.com Performance, Maintenance and Payment Bond in the amount of 100% of their bid. Bid Bond in an Amount of 5% Question Acceptance Deadline 03/15/2023 02:00 PM EDT project question contact to Jason Arlow, jarlow@aewinc.com.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents