Similar Projects
Doral Pedestrian Bridge Design Build
Bidding
$4,800,000 est. value
Doral, FL

SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Roadway Resurfacing - Mulitiple Site
Results
Less than $999,000 est. value
Miami, FL 33128

Systemwide Bridge Rehabilitation and Joint Repairs
New Construction
Bidding
Miami, FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Sidewalk Improvements - Multiple Sites
Results
Less than $321,370 est. value
Kendall, FL 33193

Citywide Sidewalk Improvements Phase II
Infrastructure
Bidding
Doral, FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Affordable Housing - 1650,1655,1675, and 1680 West 56th Street Accessible (ADA) Parking Spaces Improvements
Results
Hialeah, FL 33012

Biscayne Everglades Greenway Trail Construction
Infrastructure
Bidding
Less than $1,843,910 est. value
Homestead, FL 33030

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Bike/Pedestrian Facilities Improvements
Results
Miami, FL 33189

Reported 06/18/2021 12:00 AM
Project Title

Design-Build Services for the Underline - Phases 3 - 9

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,608,364
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Services for The Underline - Phases 3 - 9 (the “Project”). The Underline Project, once all phases are completed, will be a 10-mile linear mobility corridor below the Metrorail. Design-Build services are required for approximately 7.36 miles of improvements running within or parallel to Miami-Dade County Metrorail’s Right-of-Way and sometimes within adjacent municipality Right-of-Way that includes separate paved off-street bicycle, and pedestrian paths, shared use paths, two pedestrian/bicycle bridges over small waterways/canals, native landscaping, site furniture and equipment, amenities, way finding signage, pavement markings, intersection improvements, lighting, drainage, environmental remediation, WI-FI and security infrastructure, and reconfiguration of parking lots. Services will include, but are not limited to: civil, landscaping, electrical, and drainage design, surveys, geotechnical, permitting, signage, leading public meetings, including their coordination and participation, coordination of all utilities with DTPW, Water and Sewer Department and utility companies, soil remediation, air monitoring plan, air monitoring during construction, reporting, dust control plan, health and safety plan, soils management plan and documents required by Department of Environmental Resources Management’s Pollution Remediation Section, coordination of aspects of the design with the DTPW, Friends of The Underline, City of Miami, City of Coral Gables, City of South Miami and Miami-Dade County, construction; and any ancillary tasks necessary to design and build the Project and comply with the commitments submitted to the Federal Transit Administration in the project’s National Environmental Policy Act checklist.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Site Remediation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents