Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Lift Station Rehabilitation PY21, (Pocket Road and Missouri Avenue)
Renovation
Bidding
$400,000 est. value
Alorton, IL 62207

Lift Station Rehabilitation PY21 (42nd Street and Market Avenue)
Renovation
Bidding
$3,000,000 est. value
Centreville, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Sugar Creek Pump Station Rehabilitation
Results
Less than $700,000 est. value
East Moline, IL

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

Pump Station 31 Fence Extension
Renovation
Bidding
$70,000 est. value
South Elgin, IL

STP Influent Pumping Station Rehabilitation
Post-Bid
Eldorado, IL

Sugar Creek Pump Station Improvements
Results
Less than $10,000 est. value
Bloomington, IL

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Main Street and Organ Street Pumping Station Rehabilitations
Renovation
Post-Bid
Eldorado, IL

Last Updated 06/02/2022 11:11 PM
Project Title

Aldeen Pumphouse Improvements

Physical Address View project details and contacts
City, State (County) Rockford, IL 61107   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install new pump station control system within existing irrigation pump house at Aldeen Golf Club. Contractor to complete partial demolition of existing control system and installation of new Watertronics brand system. Work includes furnishing all equipment, selective demolition, installation of new equipment, system setup and training.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents