Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Commodities And Services
Term Contract, Alteration
Post-Bid
Washington, IL 61571

RR-21-4821 Pavement Repairs
Infrastructure
Results

Fire Station 1 Parking Lot Rework
Infrastructure
Results
Pekin, IL 61554

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
South Pekin, IL

Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge
Infrastructure
Results
IL

Architectural Barriers Removal-Sidewalks
Infrastructure
Post-Bid
Armington, Creve Coeur, Delavan, East Peoria, Mackinaw, Minier, South Pekin, Washington, IL

Pavement Patching and Hma Overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co Line
Infrastructure
Results
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Reconstruction and Widening of Courtland Street to a 5-Lane Section from Walton Avenue to Main Street
Infrastructure
Results
Morton, IL

Illinois Central College Campus Pavement
Infrastructure
Post-Bid
$185,000 est. value
East Peoria, IL 61635

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Hot-Mix Asphalt Resurfacing of Harding Road in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Results
Delavan, IL

Hot-Mix Asphalt Resurfacing of Broadway Road in Tremont Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Last Updated 05/31/2023 11:46 AM
Project Title

Construction of 2023 Main Street Reconstruction

Physical Address View project details and contacts
City, State (County) Deer Creek, IL 61733   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Separate sealed BIDS for the construction of 2023 Main Street Reconstruction Reconstruct approximately 150 LF bituminous roadway with parking area including handicap parking and adjacent PCC sidewalk. Generally includes 243 CU YD Earth Excavation, 318 TON Aggregate Base Course, 1,198 POUND Bituminous Prime Coat, 46 TON Bituminous Surface Course, IL-9.5, N50, 46 TON Bituminous Binder Course, IL-19.0, N50, 455 SQ FT PCC Sidewalk, Erosion Control, Pavement Markings, and required appurtenances.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents