Similar Projects
Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

48-inch Transmission Line/Canyon 36 - City of Provo
Infrastructure
Conception
$5,375,000 est. value
Provo, UT 84601

Stronghold Development
New Construction - 1,697,440 SF
Design
$10,000,000 CJ est. value
Logan, UT 84321

Daybell Warehouse
New Construction - 22,890 SF
Design
$10,000,000 est. value
Spanish Fork, UT 84660

Town of Garden City South Well
Infrastructure
Bidding
$650,000 CJ est. value
Garden City, UT 84028

Southern Utah University (SUU) Valley Farm New Stock Building
New Construction - 8,200 SF
Bidding
$403,000 est. value
Cedar City, UT 84721

Nielsen's Frozen Custard / North Ogden
Infrastructure, Renovation - 2,282 SF
Sub-Bidding
North Ogden, UT 84414

Replacement of Microversa MVT Trip Units on Breakers in Substation
Infrastructure
Sub-Bidding
$400,000 CJ est. value
West Jordan, UT 84088

Police East Bay Metal Building
Post-Bid
Provo, UT 84606

New Transportation and Warehouse Additions
Addition
Post-Bid
Saint George, UT 84770

Power Building Site Work
Results
Salem, UT 84653

Reclamation Construction for Mineral Canyon Project
Results
UT

Black Desert Resort
New Construction
Construction
Ivins, UT

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

K Lund Mechanical Warehouse Addition
Addition - 4,913 SF
Pending Verification
Sandy, UT 84070

Last Updated 07/25/2022 11:34 AM
Project Title

DFCM Construction Pre-qualified General CUCF Plant Maintenance Machine Shop Expansion

Physical Address View project details and contacts
City, State (County) Gunnison, UT 84634   (Sanpete County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $819,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The Department of Corrections has asked for help with the expansion of their machine shop at the Central Utah Correctional Facility. The Contractor will need to provide all labor, materials, equipment, etc. as outlined in the plans and specifications for the Base Bid. Please note, the contractor is to have all materials and equipment on-site before work on-site begins. A staging area will be provided on-site for materials and equipment if needed. If the Contractor is having items shipped directly to CUCF. The Contractor MUST be on-site to receive, unload, and stage those items. Deliveries will be turned away if the Contractor isn't on-site to receive them. Additionally, the Contractor MUST provide equipment to load/unload all shipments to the site. CUCF WILL NOT provide any equipment or manpower to unload the Contractor's items. The Contractor is to coordinate project start times with DFCM Project Manager as this Project will coincide with a DFCM roofing Project in the same area. Current start time is spring 2023. A DFCM Non-Disclosure Agreement Form is required for each person requesting viewing rights to the various project-related documents. Email the completed DFCM Non-Disclosure Agreement Form (which is provided in Buyer Attachments) to dfcmcontracts@utah.gov. Question Submission Close Date 6/7/2022 3:00 PM MDT

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents