Similar Projects
New Legal Center
New Construction
Conception
$9,000,000 est. value
Kingman, AZ

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

I-11 Rancho Santa Fe TI - City Of Kingman
Infrastructure
Design
$48,817,815 est. value
Kingman, AZ

Remodel of Municipal Court Administrative Offices - City of Bullhead
Build-out, Renovation
Post-Bid
$232,609 CJ est. value
Bullhead City, AZ 86442

Rotary Park Restroom
New Construction, Infrastructure
Results
$129,375 CJ est. value
Bullhead City, AZ 86442

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Last Updated 08/24/2023 12:41 PM
Project Title

Section 10 WRP Headworks Improvements

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86429   (Mohave County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Misc. Buildings, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The improvements to be completed at the Section 10 WRP include the construction of a new headworks building which will contain Owner supplied precast influent channels, mechanical screens, conveyors and wash presses. The Contractor will be responsible for installation, testing and startup of the Owner supplied materials and equipment, as well as for furnishing and installing necessary materials and equipment to perform site excavation, installation of new yard piping, construction of concrete foundations, walls and floors, masonry block walls, a roof system, doors, hatches, grating, stairs, HVAC systems, odor control piping and treatment system, conduit for controls and electrical wiring, and electrical equipment. Work will involve connections to existing plant piping, protecting underground utilities, asphalt patching, replacing concrete curb and gutter and overall site restoration disturbed by construction and coordination with the Owner's supervisory control and data acquisition programmer. BONDS: Bid Bond: 10% Payment Bond: 100% Performance Bond: 100% LIQUIDATED DAMAGES FOR FAILURE TO ENTER INTO CONTRACT The successful bidder, upon failure or refusal to execute and deliver the Agreement, Bonds, and certificates required within ten calendar days from the date of the Notice of Award, shall forfeit to the Owner, as liquidated damages for the failure or refusal, its bid bond and shall owe the Owner the difference between its bid and the amount of the contract actually entered into with another party. Project Completion Date: 270 Calendar days or less after Notice to Proceed. Construction must be complete and new headworks placed into service by June 7, 2024. Technical questions regarding the substance of this IFB must be submitted in writing or by email and received no later than August 6, 2023. Only those plan holders registered with the City of Bullhead City will receive any modifications to the plans, specifications and bid documents and any notices that are issued during bidding. City of Bullhead City reserves the right to accept or reject any or all bids or any part thereof and waive informalities deemed in the best interest of the City. The work shall occur in the areas as shown on the Drawings which are within the site of the Section 10 Water Reclamation Plant (WRP). The plant is located west of Highway 95, at the end of Richardo Avenue in Bullhead City, Arizona. A. The Contractor shall, except as otherwise specifically stated in applicable parts of these Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, bypass equipment, temporary equipment, facilities, and services necessary for the proper execution, testing, and completion of the work. B. This project will provide the Owner with a new headworks building which will contain Owner supplied precast influent channels, mechanical screens, conveyors and wash presses for the removal and disposal of trash and debris prior to the water reclamation plants influent pump station and generally consists of the following major items of work: 1. Construction of a new headworks building consisting of site excavation, installation new yard piping providing connections to existing systems. 2. Installation of Owner supplied equipment and material consisting of precast influent channels, mechanical screens, conveyors and wash presses and equipment control panel. 3. Contractor procured and installed concrete foundations, walls and floors, masonry block walls, a roof system, doors, hatches, grating, stairs, HVAC equipment and ducting. 4. Contractor procured and installed odor control piping and treatment system. 5. Contractor procured and installed electrical conduit, wiring, equipment and power and control. 6. Grading and site work associated with the improvements in and around the new headworks building to control new drainage from the building and existing site drainage. 7. Protecting the existing plant water system and maintain its operation during construction. 8. Protecting the influent sewer main and maintain its operation until the new building is constructed and the new equipment is operational. 9. Bypass pumping to divert the entire flow of the Section 10 WRP away from the new headworks building in order to complete the improvements and make the necessary connections to the existing piping while maintain the operation of the plant water system via a temporary connection. 10. Connect the new equipment to existing plant power, SCADA and plant control systems. Coordinate with the City's SCADA provider for programming and startup of the equipment. 11. Other miscellaneous work as shown on the Drawings.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents