Similar Projects
Stoddard Pathway Extension Phase 3
Infrastructure
Bidding
$150,000 est. value
Bowmont, ID 83686

Harding Street Pedestrian Connection
Infrastructure
Bidding
$780,000 est. value
Boise, ID 83705

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

45th East Roadway Widening Project
Infrastructure
Bidding
$3,000,000 est. value
ID

Replacement of Concrete
Infrastructure
Post-Bid
Harrison, ID

Adding Bicycle Land Updating Sidewalks
Infrastructure
Results
$10,000,000 to $15,000,000 est. value
Bonners Ferry, ID

Fairview Avenue and Orchard Street Pedestrian Improvements
Infrastructure
Bidding
$521,000 est. value
Boise, ID 83706

2022 Waterline Surface Repair
Infrastructure
Post-Bid
Idaho Falls, ID

Sixth Street Pedestrian Improvements
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Christine St, Northview St To Ustick Road
Alteration
Results
$1,100,000 est. value
ID

Ketchum Sidewalks Infill 2022
Infrastructure
Post-Bid
$400,000 est. value
Ketchum, ID

Reported 06/15/2022 12:00 AM
Project Title

2022 Sidewalk Improvements Project

Physical Address View project details and contacts
City, State (County) Arbon, ID 83212   (Power County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The City of Pocatello has secured funding for a project, which includes repairing of sidewalks and ADA curb ramps in areas of the city identified through the Community Development Block Grant program and/or the City of Pocatello's Transit Authority. The project locations will be determined prior to construction. Project scope includes the removal and disposal of existing non-compliant curb/sidewalk sections or ADA ramps, new base preparation, forming/pouring of new sidewalk, curb ramp, curb/gutter, and asphalt patch back per plan. Each sidewalk and curb ramp must be inspected by city staff. Contractor is also responsible for traffic control through the duration of the project and must adhere to the Manual on Uniform Traffic Control Devices (MUTCD).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents