Similar Projects
Lakeville Nursery Redevelopment
New Construction - 37,000 SF
Conception
Lakeville, MA 02347

Billerica Biomanufacturing Facility
New Construction - 200,000 SF
Conception
Billerica, MA

New England Tortilla Manufacturing Plant
Renovation
Design
Less than $2,818,103 est. value
Brockton, MA 02301

Draper Factory Redevelopment
New Construction, Demolition - 250,000 SF
Design
Hopedale, MA 01747

Legacy Labs
Build-Out - 7,200 SF
Post-Bid
$646,000 est. value
Worcester, MA 01603

Unified 2 Facility
New Construction - 1,010,000 SF
Post-Bid
Sutton, MA

Worcester County Welding Addition
Addition - 8,100 SF
Construction
Leicester, MA 01542

Blount Fine Foods
Addition - 3,620 SF
Construction
Less than $696,628 est. value
Fall River, MA

Takeda Commercial Cell Therapy Manufacturing Facility
New Construction - 38,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Lexington, MA

Former Harbor Fuel Tank Farm Decommissioning Project
New Construction, Demolition
Pending Verification
Nantucket, MA 02554

On the Dot Mixed Use Development
New Construction - 10,000,000 SF
Design
$10,000,000 CJ est. value
Boston, MA 02127

New Balance Manufacturing Facility
Renovation - 80,000 SF
Construction
$15,000,000 est. value
Methuen, MA 01844

Releaf Cultivation
New Construction
Pending Verification
Gardner, MA 01440

Coastal Infusions Marijuana Cultivation Center
Renovation
Design
Salisbury, MA 01952

Eagle Mill Redevelopment
New Construction, Renovation - 67,000 SF
Construction
$60,000,000 est. value
Lee, MA 01238

Reported 06/24/2022 08:52 AM
Project Title

Corrosion Materials Expansion

Physical Address View project details and contacts
City, State (County) Auburn, MA 01501   (Worcester County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 23, 2022, this project is seeking approvals with the Auburn Planning Board. Information regarding an architect or general contractor has not been disclosed. Although there is not a firm timeline, construction could begin in fourth quarter 2022.

Details

Manufacturing/Processing Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents