Similar Projects
2023 Pavement Preservation Program Thin Friction Wearing Course - Districts 1 & 2
Infrastructure
Bidding
$5,000,000 CJ est. value
Norwich, CT 06360

Bituminous Concrete 2023
Infrastructure
Sub-Bidding
$200,000 CJ est. value
New Milford, CT 06776

Ready-Mixed Concrete, Portland Cement Bags, and Cement Patching Materials
Term Contract
Sub-Bidding
Hartford, CT 06103

Remediation Services for Crumbling Concrete Foundations
Alteration
Post-Bid
Hartford, CT

Concrete Pads for Pavilions
Alteration
Post-Bid
Meriden, CT 06450

Madison Town Hall Concrete Step Project
Results
Madison, CT

General Construction Equipment, Labor and Material Rates
Term Contract, Alteration
Results
Naugatuck, CT

Farmington High School and FPS Central Office Projects - Millwork, Acoustical & Drywall Package
Term Contract, Demolition, New Construction, Renovation, Infrastructure - 239,500 SF
Construction
$13,380,948 CJ est. value
Farmington, CT 06032

Bituminous Concrete
Term Contract
Sub-Bidding
Milford, CT 06460

Old State House Piping Repair
Alteration
Post-Bid
Hartford, CT

Pre-Cast Concrete Dugouts
Infrastructure
Results
$98,500 est. value
Newington, CT 06111

Signage and Site Concrete - North Branford High School Project
Infrastructure, Alteration
Post-Bid
$1,200,000 est. value
North Branford, CT 06471

Demolition and Removal of Existing Concrete Slab and Installation of New Concrete Slab
Alteration
Results
Southington, CT 06489

Parking Deck Concrete Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ansonia, CT 06401

Concrete Work and Preparations Dugout Construction
Alteration
Results
Winsted, CT 06098

Last Updated 02/02/2023 02:31 PM
Project Title

Intersection Improvements on U.S. Route 1

Physical Address View project details and contacts
City, State (County) Westport, CT 06880   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $12,992,993 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 02, 2023, project was awarded to Guerrera Construction Co., Inc. , awarded amount is $12,992,992.50**  State Project Number(s) & Description: State Project No. 0158-0215; Intersection improvements on U.S. Route 1 in Westport Required Prequalification Work Classification(s): 7A - Major Reconstruction of Non-Freeway State Routes Federal-aid Project Number(s) & Funding Source: F.A.P. No. 000T(365) - FHWA & State Pre-Bid Conference and/or Site Visit Information: N/A District Number(s) : 3 - New Haven Contract DBE % Goal or SBE % Set-Aside: DBE 10% Project Scope Code: G - $ 5,000,000 - $ 7,499,999 Completion Date : 514 Calendar Days Liquidated Damages Rate: 2,000.00 Days DBE Submittal Requirements - The two (2) lowest bidder's DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all "backup" documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidder's SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no 736later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. Prequalification Requirements: Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Bid Proposal Forms: All prospective bidders requesting to obtain the official Bid Proposal Form must submit a completed Bid Proposal Request Form (Part C) to the DOT Contracts Unit per the above instructions. If the Bid Proposal Request Form (Part C) and the Contractor Prequalification Application are found to be satisfactory, the bidder will receive an email response from the Department instructing the bidder to download the electronic Bid Proposal Form Bid Bond Security: Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department s (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid; or (b) the bidder has on file in the Contract Section a current Department (CTDOT) standard annual bid bond form, satisfactory to the Commissioner, on the form furnished by the Department. DOT encourages bidders to file an Annual Bid Bond with the Department so that the bidder does not have to submit a bid bond each time they bid on a specific project/proposal. At the time of the bid opening, the surety must be a corporate surety licensed by the Insurance Commissioner of the State of Connecticut and must hold a Certificate of Authority as an acceptable Surety and/or Reinsuring Company acceptable to the Federal Department of Treasury. The surety's underwriting limitation must not be less than the full amount required by the bond itself. Pre-Bid Questions and Answers: Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. Please Note - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. Prevailing Wage Rates: The minimum rates to be paid labor of the various classifications shall be in accordance with current schedule of wages established by the State Labor Commissioner as provided in the Connecticut General Statutes, as revised. The Contract Wage Certification Form is to be submitted to the Labor Commissioner before the award of the contract. The Department, prior to the awarding of any contract, may require further financial and other information from any applicant who becomes the low bidder for that contract. The Commissioner of Transportation reserves the right to reject any and all bids. CTDOT - Intersection Improvements on U.S.Route 1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents