Similar Projects
Crack Sealing Contract
Infrastructure
Conception
$4,650,000 CJ est. value
N Merrick, NY 11566

I 495 Pavement Rehab Ex 32 to 48
Infrastructure
Conception
$35,000,000 CJ est. value
Old Westbury, NY 11568

WSP at Old Country Rd Ramp Impvt
Infrastructure
Design
$4,150,000 CJ est. value
Carle Place, NY 11514

AutoZone #6872 / Westbury
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Westbury, NY 11590

Replacement of Track and Turf Field at Michael J. Tully Park
Infrastructure
Bidding
$2,000,000 CJ est. value
North New Hyde Park, NY 11040

Clean Fill Removal Services
Alteration
Post-Bid
Elmont, NY 11003

Purchase Of Split Rock Booster Station Rebid
Addition
Post-Bid
Syosset, NY 11773

Parkway Plant Booster Station and Tank Rehabilitation
New Construction, Infrastructure
Results
Great Neck, NY 11020

Rockville Centre Police Station - Site Construction
Infrastructure
Results
Rockville Centre, NY 11570

Wellhead Treatment for Emerging Contaminants and Nitrate Removal at Shelter Rock Road Plant
Renovation
Construction
$8,502,750 CJ est. value
Manhasset, NY 11030

Glen Cove Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Glen Cove, NY 11542

St. Michael's Home Assisted Living Facility
New Construction, Infrastructure - 90,000 SF
Pending Verification
$25,000,000 CJ est. value
Uniondale, NY 11553

NY 107 Over I495 Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Massapequa, NY 11758

Heritage Village
Demolition, New Construction, Infrastructure - 59,150 SF
Design
$200,000,000 CJ est. value
Hicksville, NY 11801

Bellerose Village Road Repairs 2022
Infrastructure
Post-Bid
$300,000 CJ est. value
Bellerose Village, NY 11001

Last Updated 01/23/2023 01:10 AM
Project Title

Long Beach WPCP Consolidation Pump Station Conversion

Physical Address View project details and contacts
City, State (County) Long Beach, NY 11561   (Nassau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $33,387,700 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

R.J. Industries, Inc. is a general construction company; continuously seeking M/WBE, SDVOB, and Section 3 firms. We offer Equal Employment Opportunities, and welcome all Diversity Classifications. We are the apparent low bidder and invite all disadvantaged firms to join our project orientation program. Orientation will be conducted on the following dates: 11/28/22, and 12/05/2022. The available conference call sessions are being held between the hours of (9 am - 12 pm) & (1 pm - 3 pm). All who are interested in participating in the orientation program may contact the R.J. Industries, Inc. D/M/WBE Compliance Officer, Simone Washington at swashington@rjii.net / 516-845-9772 x122; to schedule a conference call. Long Beach WPCP Consolidation Pump Station Conversion Contract No. S35109-01GR 30% M/WBE Goal - 6% SDVOB Goal 30% Section 3 New Hire - 10% Section 3 Business Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15.00% Women Owned Sub-Contracting Goal: 15.00% Service-Disabled Veteran-Owned Business Contracting Goal: 6.00% Contract term: 844 Days County(ies): Nassau Location: Long Beach, NY *Per Owner- The project is not out for rebid*

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents