Similar Projects
New Jesup Highway Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brunswick, GA 31520

Checkers / Brunswick
New Construction, Infrastructure - 1,343 SF
Design
$600,000 CJ est. value
Brunswick, GA 31525

Checkers / Brunswick
New Construction, Infrastructure - 1,343 SF
Design
$600,000 CJ est. value
Brunswick, GA 31525

Milling, Inlay and Plant Mix Resurfacing on SR 25
Infrastructure
Bidding
$3,000,000 CJ est. value
Brunswick, GA 31523

Second Harvest Food Bank Expansion
Addition, Demolition, Infrastructure, Build-out - 59,300 SF
Bidding
$300,000 CJ est. value
Brunswick, GA 31525

Needwood Middle, Golden Isles Elementary and Oglethorpe Point Elementary Modifications and Renovations
Renovation
Post-Bid
Brunswick, Saint Simons Island, GA 31525

St. Simons Elementary School Phase 1 Site Work
Post-Bid
Brunswick, Saint Simons Island, GA 31525

South Palm and Hornet Ditch Drainage Improvements
Infrastructure
Results
$5,960,408 CJ est. value
Brunswick, GA 31520

Sterling Drainage Improvements
Infrastructure
Results
$1,413,680 CJ est. value
Brunswick, GA 31520

Canal Road Self-Storage Complex
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brunswick, GA 31525

Coley Electric Addition
Addition, Demolition, Infrastructure - 12,120 SF
Pending Verification
$2,000,000 CJ est. value
Brunswick, GA 31525

Neptune Park Fun Zone Mini-golf Re-landscape Project
Infrastructure
Design
$300,000 CJ est. value
St Simons Is, GA 31522

Saint Simons Island (SSI) Village Drainage Improvements Phase II FY23
Infrastructure
Bidding
$500,000 CJ est. value
Brunswick, GA 31520

SSI ES New Construction Phase 2 - Steel and Concrete
New Construction
Post-Bid
Saint Simons Island, GA 31522

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 303
Infrastructure
Results
$4,642,467 CJ est. value
Brunswick, GA 31520

Last Updated 10/06/2022 09:04 AM
Project Title

St Simons Elementary School New Construction - Phase 4 -PE Building , Admin Addition and New Kitchen

Physical Address View project details and contacts
City, State (County) St Simons Is, GA 31522   (Glynn County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Food/Beverage Service, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work is all bid packages necessary to construct a new kitchen, administration offices, and gymnasium. Work includes sitework, cast in place concrete, masonry, structural steel, lightweight insulating concrete roof deck, miscellaneous rough carpentry, wood veneered architectural cabinets, EIFS, vapor barriers, roofing, insulation, fire proofing and sealants, doors, storefront and curtain wall systems, hardware, finishes, specialties, blinds, fire protection sprinkler system, plumbing, HVAC system, electrical and communication systems The Glynn County Board of Education and McKnight Construction Company, Inc. encourages participation by local and minority subcontractors, suppliers, and vendors. No proposal may be withdrawn for a period of thirty (30) days after time has been called on the date of opening. Please direct all questions to Ms. Debi Vest of John A. Tuten & Associates, Architects, via email: debiv@johntuten.com . *The value below reflects that of the parent project and not necessarily this particular package. Schedule- January 9, 2023: Mobilization for Phase 4 and Begin Demo of Existing Buildings February 1, 2023: Begin Construction on Kitchen and Administration March 1, 2023: Begin Construction on Gymnasium August 1, 2023: Substantial Completion on Kitchen December 1, 2023: Substantial Completion on Administration and Gymnasium March 30, 2024: Substantial Completion on Sitework

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents