Similar Projects
Pipe Rehabilitation
Infrastructure
Bidding
Penhook, VA 24137

Precast Concrete Bridge Culvert
Infrastructure
Bidding

Drainage Channel Repairs
Post-Bid
Stanley, VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Drop Inlet and Pipe Cleaning Services-Ashland
Term Contract
Bidding

High Knob Recreation Area Improvements Project
Post-Bid
Norton, VA

Tunnel Wall Tile Repair/Replacement
Results

Professional Engineering Services - College Street Drainage Improvements
Infrastructure
Bidding
$3,150,000 est. value
Christiansburg, VA 24073

Construction of Educational Pond Rehabilitation at Virginia Aquarium
Infrastructure
Post-Bid
Virginia Beach, VA

Drop Inlet and Pipe Cleaning
Term Contract
Results
Colonial Heights, Richmond, VA 23834

Construction of North Holly IIIB Watershed Improvements
Infrastructure
Post-Bid
Virginia Beach, VA

160'X 66" Round Steel Liner and Precast Concrete Headwall Appomattox Residency
Results
Shipman, VA 22971

Precast Box Culvert Wise Residency
Infrastructure
Post-Bid
Bristol, Norton, VA

Reported 03/18/2022 12:00 AM
Project Title

Pre-Qualification for Saint Clair Brooks Park Stream Restoration

Physical Address View project details and contacts
City, State (County) Falmouth, VA 22405   (Stafford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will generally consist of restoration of approximately 1,400- linear feet of a stream though St. Clair Brooks Park that feeds into the Rappahannock watershed. Restoration will include grading and stabilization of the stream channel and floodplain; selective realignment of the stream channel; installation of control structures including live stakes, brush/wood toe; reinforced channel bedding, stone sills, log sills, ford crossings, erosion control matting and native landscaping.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents