Similar Projects
Jesters Creek East Outfall Replacement - Phase 2
Infrastructure
Bidding
Forest Park, Jonesboro, GA 30236

2019 CDBG - Street and Drainage Improvements
Infrastructure
Bidding
$1,500,000 est. value
Camilla, GA

Storm Drainage and Street Improvements Phase III
Post-Bid
Bronwood, GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Fraction Bottoms Road Culvert Replacement
Infrastructure
Bidding
Buckhead, GA 30625

Downey Street Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Stormwater Design for Georgia Avenue
Infrastructure
Bidding
Hampton, GA 30228

Stormwater Maintenance Plan
Post-Bid
Savannah, GA 31404

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Shadburn Ferry Road Drainage Improvements
Infrastructure
Bidding
Buford, GA

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Holly Court Drainage Repairs
Results
Acworth, GA 30101

Last Updated 12/17/2021 08:55 AM
Project Title

CCCP Pipe Lining

Physical Address View project details and contacts
City, State (County) Peachtree City, GA   (Fayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,904
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the trenchless rehabilitation (CCCP Lining Method) of 950 LF of 42” to 54” diameter corrugated metal stormwater drainage pipe including 204 LF of 36” x 42” elliptical pipe. The selected pipes are located throughout the City

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents