Similar Projects
Boiler Replacement at Country Club Administration Building
Renovation
Sub-Bidding
$300,000 CJ est. value
Willingboro, NJ 08046

HVAC - All Regions
Term Contract
Post-Bid

Carslake Community Center Installation of British Thermal Unit (BTU) or Equivalent Rooftop Unit and Installation of Hydronic Wall and Ceiling Heaters
Renovation
Post-Bid
$300,000 CJ est. value
Bordentown, NJ 08505

Bldg. 562 Air Duct Cleaning
Term Contract
Results
NJ

Water Filtration Plant Dehumidification Unit Installations
Renovation
Results
$599,400 CJ est. value
Willingboro, NJ 08046

HVAC-R Services
Alteration
Post-Bid
Pemberton, NJ

Removal and Replacement of HVAC Equipment For the Motor Control Center
Alteration
Results
Lumberton, NJ 08048

Maintenance Services on Building Automation, HVAC, Mechanical Systems Maintenance
Alteration
Post-Bid
North Hanover, NJ

Unit Ventilator Replacements at Hillside, Harrington and Countryside Schools
Alteration
Results
Mount Laurel Township, NJ 08054

HVAC Replacement at Group Home
Renovation
Post-Bid
$800,000 CJ est. value
Moorestown, NJ 08057

HVAC Improvements at the Burlington County Institute of Technology
Alteration
Results
Westampton, NJ 08060

Blue Barn Recreation Facility HVAC Improvements
Renovation
Post-Bid
$40,000 CJ est. value
Evesham, NJ 08053

Chiller Replacement at MacFarland Intermediate and Clara Barton Elementary Schools
Alteration
Results
$425,000 est. value
Bordentown, NJ 08505

Shawnee High School Phase 2 HVAC-A
Renovation
Post-Bid
$10,000 CJ est. value
Medford, NJ 08055

Seneca High School Variable Refrigerant Flow (VRF) Replacement
Renovation
Results
$542,600 CJ est. value
Tabernacle, NJ 08088

Last Updated 03/24/2023 09:43 AM
Project Title

Lenape Regional High School District - Seneca High School Phase 2 HVAC-B

Physical Address View project details and contacts
City, State (County) Tabernacle, NJ 08088   (Burlington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $698,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Please note: an official estimated value or budget is not being released for this project. Any values listed are for searchability purposes only and may not reflect the true value of the project. 1. CONTRACT FOR MECHANICAL CONSTRUCTION - PROJECT DELINEATION. The scope of the work of the different projects within this bid are as follows. Refer to Architectural Drawing A1.0, "General Notes and Schedules" for a delineation of the areas included within each project referenced below: a. SNC-04, Chiller Plant Expansion. 1) Installation of a new 280 ton air cooled chiller as scheduled and detailed, with all required and specified piping, pumps and appurtenances. 2) Modifications to the existing chiller and chilled water piping system and associated pumps as detailed and necessary to accommodate the new chilled water plant. 3) Structural Steel Work, including construction of the new dunnage frame as required to support the new chiller. 4) Plumbing work specified and necessary to complete the scope of the work. 5) Electrical work specified and necessary to complete the scope of the work. 6) BMS installation and integration as delineated within the contract mechanical drawings and specifications. 7) Restoration of existing building finishes affected or altered und the scope of this contract, including but not limited to interior wall, ceiling and floor finishes, exterior brick finishes, and the existing roof. The existing roof at this area of Seneca High School is under warranty, the contractor shall perform the work in struct compliance with the terms and conditions of the roofing manufacturer's warranty, as specified within these documents.. a. General Coordination responsibilities including the following: 1) Coordination of the work with other prime Contractors active on the project site. Other Contractors shall act in accordance with the schedule dictated by the Owner, and shall coordinate all construction activities through the General Contractor and Owner, as agreed and accepted by the Owner and Architect. b. Selective demolition responsibilities included within the scope of the project shall include the following: 1) Removal of wall mounted equipment and furnishings as designated and required to complete the scope of the proposed work 2) Preparation of existing concrete subfloor and substrates as required to accommodate the proposed construction. 3) Repair, patching and preparation of existing ceiling construction as required to accommodate the proposed construction, and as required to accept the specified finishes. 4) Removal and relocation of existing electrical, plumbing and mechanical systems indicated and required for the performance of the proposed work. c. Supply and installation of steel roof dunnage, frames and supports as required to accommodate the proposed mechanical construction. Note that the conditions vary at each area, and are to be field verified. d. Removal and restoration of acoustical panel ceiling systems, including coordination and sequencing of the work with the owner and other contractors. e. Patching of building finishes damaged or altered as a result of the work of this contract. The work of this contract shall include, but is not limited to, floor tile removal and replacement necessary to accommodate the removal and replacement of the specified mechanical systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents