Similar Projects
San Marcos Consolidated ISD Administration Office Renovation
Renovation
Conception
$7,000,000 est. value
TX

2022 Bond - Proposition A - Seguin Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$135,000,000 CJ est. value
Seguin, TX 78155

Loop 1604 and I-10 Interchange - Texas Department of Transportation
Infrastructure
Design
$1,360,000,000 CJ est. value
Schertz, TX 78154

Loop 1604 and I-10 Interchange - Texas Department of Transportation
Infrastructure
Design
$1,360,000,000 CJ est. value
Schertz, TX 78154

Dutch Bros Coffee / Seguin
New Construction, Infrastructure - 950 SF
Bidding
$650,000 CJ est. value
Seguin, TX 78155

Alliance Regional Water Authority Phase 1B Est - South
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
New Berlin, TX 78155

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Jack C. Hays HS - Bleachers
Renovation
Post-Bid

Sebastoopol House Re-Grading and Paving Alterations
Results
$44,750 est. value
Seguin, TX

Huber Road Overlay Project
Term Contract
Results
$605,550 est. value
Seguin, TX 78156

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

United Alloy / Phase 2
Addition, Demolition, Infrastructure - 110,423 SF
Pending Verification
$10,000,000 CJ est. value
Seguin, TX 78155

Cordova Rd
Infrastructure
Conception
$22,256,128 CJ est. value
Seguin, TX 78155

Last Updated 01/11/2023 02:05 PM
Project Title

November 2021 Bond Program/

Physical Address View project details and contacts
City, State (County) Seguin, TX 78155   (Guadalupe County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Maintenance, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $80,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Budget for the high school is $ 80,000,000 . Navarro ISD invites qualified firms to submit qualifications for Construction Manager-at Risk services for the November 2021 Bond Program of a new High School for 1100 students which includes the following: School Admin. Offices, 2-Story Classroom Wing, Media Center, Dining/Kitchen, Band Hall with practice rooms, Life Skills, Black Box Classroom, Drive/sidewalk Paving, Competition Gym to seat 1300 spectators, Practice Gym, Athletic/PE Locker Rooms, Weight Room, Training Room, Practice Fields, Dance, Theater to seat 750, and CTE/Ag facilities. Questions and additional information may be obtained from Mrs. Wendi Russell, Superintendent, at 830.372.1930. Navarro Independent School District reserves the right to accept or reject any and all submissions, to waive any formalities and irregularities in the submissions received, and will accept the response(s) determined to be in the best interests of the District. The District will be utilizing the two-step process pursuant to Texas Government Code 2269, Subchapter F for this project. Interested firms will first submit qualifications. Upon receipt of the qualifications, the District will review and then prepare a short list of firms to submit proposed fees prior to an interview with the selection committee.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents